Laserfiche WebLink
, <br /> B. THE CONTRACTOR SHALL NOT ALLOW RUBBISH OR WASTE MATERIAL TO , <br /> ACCUMULATE ON OR ABOUT THE PREMISES. AT THE COMPLETION OF THE WORK HE SHALL <br /> PROMPTLY REhiOVE ALL RUBBISH AND WASTE MATERIAL AND LEAVE THE BUILDING BROOM <br /> CLEAN AND READY FOR USE. HE SHALL LEAVE ADJOINING PROPERTY CLEANED OF REFUSE ' <br /> AND REPAIR TO THE SATISFACTION OF THE ARCHITECT. THE CONTRACTOR SHALL PROTECT <br /> EXISTING FEATURES AND ELEMENTS WHICH ARE TO REMAIN. HE SHALL RESTORE OR <br /> REPLACE, AT HIS OWN EXPENSE, ALL DAMAGE TO SAME. ' <br /> 6. EXISTING UTILITY LINE AND SERVICES <br /> A. IF ACTIVE UTILITY LINES OR SERVICES ARE ENCOUNTERED IN THE WORK, THEY , <br /> SHALL BE PROPERLY PROTECTED, BRACED AND SUPPORTED AS REQUIRED FOR THE PROPER <br /> PROGRESS AND EXECUTION OF THE WORK. IF EXISTIN6 ACTIVE UTILITY LINES OR <br /> SERVICES ARE ENCOUNTERED THAT REQUIRE RELOCATION TO PROPERLY PERFORM THE WORK, ' <br /> NOTIFY THE ARCHITECT FOR A DETERMINATION. CONTRACTOR SHALL NOT PROCEED WITH <br /> THE WORK UNTIL WRITTEN DIRECTIONS ARE RECEIVED. CONTRACTOR SHALL NOT PREVENT <br /> OR DISTURB THE OPERATION OF ACTIVE UTILITY LINES AND SERVICES THAT ARE TO <br /> REMAIN. ' <br /> 7. PROGRESS OF WORK <br /> A. A SUFFICIENT NUMBER OF COMPETENT PERSONNEL SHALL BE CONTINUALLY I <br /> EMPLOYED BY THE CONTRACTOR AND SUBCONTRACTORS TO SATISFY THE OWNER AND THE <br /> ARCHITECT THAT THE WORK WILL BE COMPLETED BY THE TIME SPECIFIED, OR IN SUCH ' <br /> TIME AS NOT TO DELAY THE WORK OF OTHERS. <br /> 8. QUALITY OF MATERIALS AND WORK <br /> A. ALL WORK DESCRIBED IN THESE SPECIFICATIONS OR SHOWN ON THE DRAWINGS, ' <br /> AND ALL WORK NECESSARY TO THE COMPLETE FINISH OF THE WORK AS DESCRIBED OR <br /> SHOWN IS TO BE EXECUTED IN A THOROUGHLY SUBSTANTIAL AND WORKMANLIKE MANNER. , <br /> B. ALL WORK, FIXTURES, MATERIALS, EQUIPMENT AND APPARATUS SHALL BE NEW <br /> AND SHALL BE FIRST CLASS IN EVERY RESPECT, AND ALL SHALL BE DELIVERED UPON THE <br /> C�IPLETION OF THE WORK IN A PERFECT AND UNDAMAGED CONDITION WITHOUT EXCEPTION. , <br /> C. ALL WORK SHALL BE DONE BY PERSONNEL WHO ARE THOROUGHLY EXPERIENCED IN <br /> THEIR PARTICULAR TRADE OR CRAFT. ' <br /> 9. �OMPLETION DATE <br /> A. SEE INSTRUCTIONS TO BIDDERS, 8. COMMENCEMENT AND COMPLETION OF THE ' <br /> WORK. <br /> 10. T T N , <br /> A. THE OWNER WILL PAY FOR ALL PASSING COMPACTION, SOIL AND CONCRETE <br /> TESTS MADE. THE TEST RESULTS AND INVOICES SHALL BE SENT TO THE OWNER WITH ' <br /> COPIES TO THE CONSULTANT. ALL FAILING TESTS SHALL BE PAID BY THE CONTRACTOR. <br /> 11 . COORDINATION OF CONTRACTS , <br /> A. THE CONTRACTOR WILL BE REQUIRED TO COORDINATE WITH OTHER CONTRACTORS <br /> WHO WILL BE WORKING IN THIS AREA BUT NOT UNDER THIS CONTRACT. <br /> ' <br /> SPECIAL CONDITIONS ' <br /> PAGE 2 OF 3 <br />