Laserfiche WebLink
' <br /> PAYMENT EST. UNIT � <br /> ITEM DESCRIPTION � 4TY• �JI� PRICE EXTENSION <br /> 3.4.6 F & I PUMP, DROP PIPE AND <br /> SURFACE PLATE 1 L.S. � <br /> 3.4.7 WELL DISINFECTION & SAMPLING 1 L.S. <br /> 3.4.8 CONCRETE SLAB & BOX COVER 1 L.S. , <br /> 4.4.1 .1 4-INCH DIP 180 L.F. � <br /> 4.4.1 .2 4-INCH PVC, SDR 26 680 L.F. <br /> 4.4.1 .3 2-INCH GALVANIZED PIPE, SCH 40 35 L.F. � <br /> 4.4.1 .4 2-INCH PVC, SCH. 40 680 L.F. <br /> 4.4.2.1 4-INCH CHECK VALVE 1 EA. � <br /> 4.4.2.2 2-INCH CHECK VALVE 1 EA. <br /> 4.4.3 AIR & VACUUM VALVE 1 EA. , <br /> 4.4.4.1 4-INCH ISOLATION VALVE 3 EA. � <br /> 4.4.4.2 2-INCH GATE VALVE Z EA. <br /> 4.4.5 BOOSTER PUMP 1 L.S. L.S. t <br /> 4.4.6 PRESSURE TANK 1 L.S. L.S. <br /> 4.4.7 PIPELINE ROAD CROSSING 1 L.S. L.S. ' <br /> 5.1 ELECTRICAL 1 L.S. L.S. � <br /> TOTAL BASE BID � <br /> BID SECURITY IN THE AMOUNT OF AT LEAST 5X OF THE BID ACCOMPANIES THIS PROPOSAL, ' <br /> THE SAME BEING SUBJECT TO FORFEITURE IN EVENT OF DEFAULT. <br /> IT IS UNDERSTOOD BY THE UNDERSIGNED TNAT THE RIGHT IS RESERVED BY THE OWNER TO � <br /> REJECT ANY OR ALL BIDS AND TO WAIVE IRREGULARITIES AND FORMALITIES IN ORDER TO <br /> SERVE THE BEST INTERESTS OF THE OWNER AND THAT THIS BID MAY NOT BE WITHDRAWN <br /> UNTIL FORTY-FIVE (45> DAYS AFTER THE DATE OF OPENING. , <br /> IF THIS BID IS ACCEPTED, THE UNDERSIGNED AGREES TO PROMPTLY FURNISH A <br /> PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND IN THE FULL AMOUNT OF THE <br /> CONTRACT AWARD AND TO PROVIDE EVIDENCE OF COMPLIANCE WITH THE SUBURBAN HENNEPIN , <br /> REGIONAL PARK DISTRICT LABOR RATE REQUIREMENTS, IF APPLICABLE. FOR CONTRACTS IN <br /> AN AhiOUNT LESS THAN $15,000, IN LIEU OF THE BOND, THE SUCCESSFUL BIDDER MAY <br /> PROVIDE AN IRREVOCABLE LETTER OF CREDIT IN THE SAME AMOUNT REQUIRED FOR THE BOND , <br /> AND SUBJECT TO THE SAME CONDITIONS AS THE BOND. THE UNDERSIGNED FURTHER AGREES <br /> THAT IF AWARDED A CONTRACT FOR CONSTRUCTION, THE WORK WILL COMMENCE ON/OR ABOUT <br /> OCTOBER 19, 1992 AND HE SHALL WORK CONTINUOUSLY ON THIS PROJECT AND COMPLETE THE � <br /> WORK BY JULY 15, 1993. <br /> PROPOSAL FORM � <br /> PAGE 1 OF 3 <br />