My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: Orono/Three Rivers Park meeting
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Correspondence
>
Re: Orono/Three Rivers Park meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:30 PM
Creation date
10/16/2017 2:07:59 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Correspondence
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Melanie Curtis N���� r�'�--' <br /> From: davidma1 [davidma@bolton-menk.com] <br /> Sent: Tuesday, February 04, 2014 1:02 PM <br /> To: Melanie Curtis <br /> Cc: David P. Martini <br /> Subject: Orono/Three Rivers Park Meeting, 2/3/14 <br /> Here are the notes I took yesterday. Let me know if you have questions. <br /> Thanks, <br /> Dave <br /> Orono / Three Rivers Park Meeting, 2/3/14 <br /> • The park is a permitted use. <br /> • Restroom does not need a CUP amendment. <br /> • New well meeting Department of Health requirements will be needed. <br /> • Start construction in the fall of 2014. Finish construction in the spring of 2015. <br /> • Facility won't be open until 2015. <br /> • Irrigation will need to be relocated in the area of the restroom. <br /> • Electric is on site. Not sure if a new service will be needed. <br /> • Sewer line will be 6"and directionally drilled to minimize disturbance. <br /> • Existing well will be abandoned. <br /> • Irrigation comes from a well and tank on the north side of the road. <br /> • The pump house will be in the restroom building. <br /> • A new water line will be run to the carriage house. <br /> • New well needs to be 50'from sewer. <br /> • Need details for sewer connection to the main. <br /> • Will need a permit from Hennepin County for a utility crossing and work in the right of way. <br /> • An erosion control permit will be needed from the watershed. <br /> • 35'setback from wetlands. <br /> • Survey needs to show property boundary and existing and proposed conditions in the project area. <br /> • Need enough information on the survey to show setbacks and wetlands. <br /> Evernote helps you remember everything and get organized effortlessly. Download Evernote. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.