Laserfiche WebLink
A <br /> , protection. <br /> CONCRETE - SITE CAST <br /> A. Design Code: ACI 318, ACI "Manual of Standard <br /> Practice...", latest adoption. <br /> B. Materials <br /> 1. Minimum concrete strength at 28 days (Pc)for <br /> slabs-on-grade and walls to be 4000 psi. For footings, <br /> 3000 psi. <br /> 2. Concrete supplier to submit concrete mix designs to <br /> Architect for all site cast concrete. <br /> 3. Furnish 5-7% air entraining agent for all concrete <br /> exposed to freezing temperatures. <br /> 4. Reinforcing steel <br /> a. Welded wire fabric- ASTM A185. <br /> b. Deformed bars-ASTM A615, Grade 60. <br /> 5. Install slab on grade control joints in accordance with <br /> PCA publication "Concrete Floors on Ground". ' <br /> C. Installation notes: <br /> l. Support reinforcement only with CRSI recommended bar <br /> supports(wood, brick, etc. not acceptable)or hang from <br /> top of forms. Use supports with sand plates or horizontal <br /> runners for slab,-on-grade reinforcement. <br /> 2. Concrete cover per ACI 318, latest adoption. <br /> 3. Sawcut slabs-on-�rade as soon as concrete may be worked <br /> without unraveling(max. 6 hours after placement). <br /> 4. Place and securely tie footing dowels in position prior <br /> to concrete placement(i.e.: do not embed dowels into <br /> wet concrete). <br /> CONCRETE-PRECAST PRESTRESSED <br /> A. Design Code: ACI 318, latest adoption. <br /> B. Concrete strength at 28 days(fc): 5000 psi minimum. <br /> C. Supplier notes: <br /> 1. Precast, prestressed concrete shall be designed, • <br /> fabricated, and erected according to the specifications <br /> � of the ACI Code and the Prestressed Concrete Institute <br /> Design Handbook, latest edition. <br /> 2. Precast plank shall be design�to withstand the <br /> superimposed loads as indica.ted on plan. <br /> 3. Field welding of cast-in plates, etc.,to be performed _ <br /> only by certified welders in accordance vv�th AWS Dl.l, <br /> latest edition. <br /> 4. Precast material to be manufactured in accordance with <br /> the PCI Quality Control Manual, latest edition. <br /> 5. Submit shop drawings and certified design calculations. <br /> 6. Provide hangers in ptank at openings as rec�uired. Do not . <br /> overcut plank transverse to span direction. <br />