Laserfiche WebLink
MISCELLANE � <br /> OUS <br /> A. Placement of inechanical units sup orted b roof or floor � <br /> P Y <br /> structure is subject to the approval of the Engineer. � <br /> B. Verify all existing conditions and dimensions. Report al( <br /> conflicts in construction documents and actual conditions � <br /> to the Architect before proceeding with the affected work. � <br /> � C. Contractor is responsible for bracing all structural elements, � <br /> � �vithout overstressing, until project is complete. Stockpiling � <br /> of materials on supported tevels is at Contractor's own risk. ,� <br /> .D: Contractor to temporarily shore earth retaining walls while � <br /> backfilling. Shores can be removed only after concrete <br /> slab-on-grade is in place and has reached 70%of its design <br /> strength and ground floor is installed and connected to wall. <br />