Laserfiche WebLink
r <br /> MISCELLANEOUS <br /> A. Placement of inechanical units supported by roof or floor <br /> structure is subject to the approval of the Engineer. <br /> B. Verify all existing conditions and dimensions. Report all <br /> conflicts in construction documents and actual conditions <br /> to the Architect before proceeding with the affected work. <br /> C. Contractor is responsible for bracing all structural elements, <br /> without overstressing, until project is complete. Stockpiling <br /> of materials on supported levels is at Contractor's own risk. <br /> D. Contractor to temporarily shore earth retaining walls while <br /> backfitling. Shores can be removed only after concrete <br /> slab-on-grade is in place and has reached 70% of its design <br /> strength and ground floor is installed and connected to wall. <br />