Laserfiche WebLink
/' ' � <br /> � � � <br /> AL�1/10(1� <br /> � Daily Soil Observation Notes <br /> Project No: Date:2--`' Z-O - f t/ Report No: <br /> Project Name:Z.�-S � �Or�-i-+ ' Project Location:('7(c���� M r/1 <br /> ;� � <br /> Clfent:-1�� � � lrt'� Temp/Weather�.1 o<3c�t�,C,r�c��,.� �� <br /> Project Manager. Time Arrived: Departed: <br /> . • . . <br /> Areas Observed: Building Pad ❑House Pad ❑Roadway ❑Parking/Walks ❑Footing <br /> ❑Proof Roll Other(describe): <br /> Soil report available? ❑ Yes No Report reviewed? ❑Yes o Report prepared by;: <br /> Finish floor evaluation: Bottom of footing elevation: Bottom of excavation elevation: <br /> Approved plans availablel ❑Yes ❑No Specified compaction: Fill source: � <br /> Oversizing appears adequate7 NA ❑Yes ❑No Soils observed agree with Soils report? QYes ❑No <br /> Soils appear adequate for design loads? Yes ❑No Proposed proJect bearing capacity(psfl: � <br /> Contractor notified of results? ❑Yes No Name of person notified: <br /> Was a copy of this report left on site? Yes �(No If so,whom was it submitted to7 ��� 1►_� <br /> � � �J <br /> N <br /> n , <br /> Notes/Comments: -}�,• ('�j�j�r a,,� �+,' <br /> CG,-Y�'.'t,. �n �" �'S' '4J-,S � <br /> � <br /> r � � <br /> ,�l�) ..l -�. � - �A.S � -� � � e..�- -�,� <br /> 3 v��- •�.s►, bo�Ow� �it�S Cov� W �� � v� t <br /> t �'�-�W AS �.�in ` J` ;5-�-- , <br /> Performed By: I ``r Reviewed By: Date: <br /> This ts a preliminary report and is provided solely as evidence that field observations and/or testing was performed.Observations and/or conclusions and/or <br /> recommendation conveyed in the final report may vary from,and shall take precedence over,those indicated in a preliminary report. <br />