My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wetland Classification/Identification/Delineation-2013
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2565 North Shore Drive - 09-117-23-41-0004
>
Misc
>
Wetland Classification/Identification/Delineation-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:51:06 PM
Creation date
10/11/2017 12:22:15 PM
Metadata
Fields
Template:
x Address Old
House Number
2565
Street Name
North Shore
Street Type
Drive
Address
2565 North Shore Dr
Document Type
Misc
PIN
0911723410004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2* Federal jurisdiction by the Clean Water Act of 1972 and subsequent amendments. <br /> Wetland protection is implemented by the Corps of Engineers (Corps)with permit <br /> certification issued by the Environmental Protection Agency. <br /> While the wetland boundaries that SER has delineated are not official until approved by a WCA <br /> approved local government unit (LGU), SER advises the property owner/developer to refrain <br /> from any filling, draining, or excavating, or any impact to the area SER has delineated as <br /> wetland. No grading or filling in wetland basins should commence until all necessary permits <br /> have been obtained. Violation of wetland regulations may result in substantial civil and criminal <br /> penalties. Local ordinances may regulate wetland modifications such as brush and tree removal <br /> and burning in addition to grading and filling. Depending on the location of the property, bufFers <br /> around the wetland may also be protected. Any activities in the proximity of the wetland should <br /> be cleared with appropriate WCA regulatory agencies. It is also advisable to have the wetland <br /> boundary surveyed by a licensed land surveyor. Since the pin flags used along the boundary can <br /> be vandalized or inadvertently knocked over, a GPS survey of the flags will assure the <br /> permanence of the boundary. The client should also be aware that approved wetland boundaries <br /> are typically valid for only three years from the date of approval. <br /> To avoid project delays associated with wetland regulations, it is essential that you acquire <br /> necessary permits from all jurisdictional agencies before initiating activities.A WCA Sequencing <br /> form, a WCA and Army Corps of Engineers Replacement Plan Application form, and a DNR <br /> permit application are among the materials that you may be required to submit if impacts are <br /> proposed for the delineated wetlands. By initiating the permit process as soon as possible, <br /> potential costly delays to the project may be avoided. <br /> Svoboda Ecological Resources 4 2565 North Shore Dr <br /> Project Number: 2013-033 Orono,MN <br />
The URL can be used to link to this page
Your browser does not support the video tag.