Laserfiche WebLink
� � °�� . <br /> O 0��, <br /> z:,:�;,.�:.- CITY of URUNO <br /> � �3 r � <br /> �i�' 1" y <br /> � t,a`���l' el�x` "'' ��C Municipal Offices <br /> �� "'���p`!.:.�'l 41���: <br /> r.t.r•I,�;C',•'�Y s�b•� ' <br /> �� a�:.,,�-��,r����,�Gj Street Address: Mailing Address: <br /> \9 r�'`�`i''' �'4�/ 2150 Kelley Parkway P.O. Box 66 <br /> x'EsH�i <br /> Orono, MN 55356 Crystal Bay, MN 55323•0066 , <br /> To: The Current Owner of Address �'C7 �- /� � �' '"'t�p�K <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The.onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. . <br /> Imminent Public Health Threat <br /> Yes <br /> No —�- <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes <br /> No � <br /> If yes, system must be brouaht into compliance by: <br /> December 31,2007 � <br /> December 31,2010 <br /> Other ' <br /> Septic Tank(s) Pump out Needed <br /> Yes �No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> S''LO -c�S� . The tank(s) should be cleaned through the manhole and <br /> �not through the inspection pipes, this allows for proper cleaning. <br /> Comments: <br /> � <br /> Ins ecto!����:t:r(� ���" �' Date of Ins ection � -�� <br /> p P <br /> Telephone(952)249-4600 • Faa(9�2)249-4616 <br /> www�.ci.orono.mn.us <br />