My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6786
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 6700 - 6799 (November 28, 2016 - October 9, 2017)
>
Resolution 6786
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2018 2:49:13 PM
Creation date
10/10/2017 3:41:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. 6796 <br />their expected responsibility to design and construct a private trail. (example: if <br />the private trail is to cost $100,000, and Hennepin County requests city funding of <br />$200,000 for a public trail, the developer will provide $100,000.) <br />20. 10% Private Park RPUD Requirement. The private recreation area of `10% of <br />the platted property' required under the RPUD standards will be satisfied via the <br />pavilion and the reflective spaces in front of the building, and upper level patio <br />areas. <br />21. Park and Trail Dedication. There are no identifiable public parkland needs at this <br />location. The Stonebay master plan identified park dedication needs for residential <br />development because development of the proposed housing will generate <br />additional use of existing City park facilities in the area. The Council finds that no <br />park lands need to be dedicated and the park dedication should be in the form of a <br />Cash Contribution in Lieu of Lands as allowed by the Municipal Code and as <br />stipulated by the StoneBay Planned Unit Development Agreement. <br />3,250 per unit = $3,250 x 70 = $227,500.00 <br />22. Stormwater Management. Stormwater management is proposed to be provided <br />by the existing stormwater pond area east of the site. The stormwater facilities <br />will be subject to standard drainage easements. In addition to the City of Orono, the <br />Minnehaha Creek Watershed District have approval authority over the applicants' <br />stormwater management plan. Final stormwater plans will be subject to the <br />recommendations and approval of the City Engineer. <br />23. Stormwater and Drainage Improvements & Fees. The property will be subject <br />to the Stormwater and Drainage Trunk Fee. Recent Council action to revise the <br />Trunk Fee provisions would result in a fee (for development at greater than 4.0 <br />units per acre) of $8,490 per acre (2017 Fee Schedule), based on non -wetland <br />acreage. The fee is estimated at $29,715 ($8,490/ac x 3.5 acres = $29,715.00) <br />24. The applicant has provided General Concept Plans and Preliminary Plat Drawings <br />attached to this Resolution as Exhibits A-1 through A-17 including: <br />Plans prepared by Westwood Professional Services: <br />Al - Plan Sheet 1 of 10 <br />— Cover Sheet dated 6-19-17 <br />A2 - Plan Sheet 2 of 10 <br />— Survey dated 6-19-17 <br />A3 - Plan Sheet 3 of 10 <br />— Site Plan dated 6-19-17 <br />A4 - Plan Sheet 5 of 10 <br />— Grading Plan dated 076-19-17 <br />Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.