Laserfiche WebLink
CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. <br />7) Transportation: <br />a.) Internal site circulation shall be provided as shown on the site plan, <br />provided as Exhibit A3. The new road serving the development shall be <br />platted as two private road outlots as shown on the Preliminary Street & <br />Storm Sewer Plan. The east -west segment of road (Outlot D) shall have a <br />platted corridor width of 40' and a paved width (back of curb to back of <br />curb) of 28'. The north -south segment (Outlot C) shall have a platted <br />corridor width of 50 feet with a 32' paved width. The north -south segment <br />will remain privately owned and maintained until such time that Outlot A <br />is further developed, at which time the City will determine whether the road <br />in Outlot C should be taken over as a public road. <br />b.) A second access drive shall be provided at the east end of the site, to line <br />up with a drive on the north side of Kelley Parkway. <br />8) Utilities; Stormwater Management <br />a.) Sewer and water mains shall be installed by the Developer per the <br />Preliminary Sanitary Sewer and Water Main Plan attached hereto as <br />Exhibit A5, subject to the modifications noted in the City Engineer's <br />comments. <br />b.) The City will own and maintain the sanitary sewer and water mains <br />within the development. The City will inspect these systems during their <br />construction to ensure proper installation. Drainage and Utility Easements <br />shall be granted to the City of Orono over all sewer and water main lines <br />and facilities that are not within dedicated public rights-of-way in order to <br />facilitate future system maintenance. <br />c.) The Developer shall install stormwater management facilities generally <br />as shown on the various attached plans. Developer shall provide suitable <br />evidence of Minnehaha Creek Watershed District (MCWD) approval of the <br />stormwater management plan before Development Plan and Final Plat <br />Approval will be granted. The Developer shall provide sufficient drainage <br />and utility easements as necessary to allow for future City maintenance <br />access for stormwater management facilities. <br />Page 11 <br />