Laserfiche WebLink
System Overview and Summary t <br /> MemBrain sheeting may be installed as an interior air barrier system. Install large sheets using recommended <br /> fasteners, tapes and sealan�s to achieve air barrier continuiry with the building envelope components, as illustra�ed � <br /> in Figure 1. <br /> Set-up and Site Preparation ' <br /> The most effective time to install the MemBrain Air Barrier Sy�stem is: <br /> • After all building envelope penetrations are complete(i.e.,plumbing lines, elecMcal outlets, exhaust vents, � <br /> lighting fixtures, etc.) and vertical penetrations through wall plates in cavities are appropriately sealed. <br /> • After all windows and doors are ins[a11ed, and rough opening gaps are sealed appropriately (i.e., �vith <br /> code-approved low expansion foam). � <br /> • After wall systems are insulated with unfaced fiber glass insulation. <br /> • Be[ore exterior walls and ceilings are finished wi�h gypsum board. � <br /> Roof/Attic/Ceiling Applications <br /> 1.Staple MemBrain to the bottom oE ceiling joists every 1Z to 24 inches. , <br /> 2.Seal the film to interior and exterior wall top plates using recommended sealants. <br /> 3.Fasten the film using staples through the sealant to the plates ever5� 12 to 24 inches. <br /> 4.Allow the film to overlap at rhe corners a minimum of 6 inches. � <br /> Exterior Wall Applications <br /> 1.Start at a corner of the room where an interior partition wall or door jamb meets an insulated exterior wall. � <br /> Lay the MemBrain roll on the floor,with the end touching the bottom of the partition wall ar jamb. <br /> 2.Unroll MemBrain along the insulated wall,until the next corner is reached. Cut the film perpendicular to the <br /> insulated wall so that the overall length is about 8 to 12 inches longer than the wall. � <br /> 3.With the 3-inch offset edge parallel with the top of the insulated wall, place one corner of the cut shee�at <br /> the top left or right corner of the wall. The factory-cut edge should be covering the top edge of the top sill t <br /> plate. The cut edge of the sheet should wrap around the inside corner at least 4 inches. Ensure that the folded <br /> material is facing the room(the print across top header will be facing out).Anchor this corner with staples. <br /> 4.Apply recommended sealant over ' <br /> ceiling-overlapped film material at the�op pla�e, <br /> to the frame around window and door rough <br /> openings and to the bottom plate (See MemBrain ' <br /> Air Barrier System Details on page 4 and Figure Top Edge Folded Film to <br /> 17 on page 10).Working towards the opposite of Offset Unfold into Room ' <br /> corner, pull the sheet tight, and staple the offset ; � <br /> edge to the top sill plate through the sealant bead. <br /> Staples should be at least 12 to 24 inches apart. ' <br /> 5.After stapling to the opposite corner, allow the <br /> folded sheet to unfold to the floor. (See Figure 2) <br /> 6.Pull the sheet downward and staple through the ' <br /> sealant bead to the bottom sill plate. Then staple - <br /> at 1Z-to 24-inch intervals along each stud. Effort ' <br /> should be made to minimize wrinkles along the <br /> Figure 2:MemBrain sheeting orien�a(ion jor wall ins[a1ln�ion method. <br /> stud surfaces to make drywall installation easier. <br /> 7.Follow the MemBrain Air Barrier System Details � <br /> on page 4 to ensure an air-tight assembly. <br /> rv�ew.[ertnirt(eed.cont 3 � <br />