My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-00271 - new house
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2465 North Shore Drive - 09-117-23-44-0012
>
Permits/Inspections
>
2017-00271 - new house
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:51:44 PM
Creation date
10/9/2017 2:56:59 PM
Metadata
Fields
Template:
x Address Old
House Number
2465
Street Name
North Shore
Street Type
Drive
Address
2465 North Shore Dr
Document Type
Permits/Inspections
PIN
0911723440012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If you suspect that a product has frozen, contact your TBS Technical Representative or Territory Manager. ' <br /> If you inspect and determine that incoming material is frozen, do not accept delivery from the freight carrier. <br /> Safet � <br /> y <br /> Use the following safety instructions when handling TUFF-N-DRI membrane. Also review the Material ' <br /> Safety Data Sheet (MSDS), as well as the safety precautions provided by the spray equipment <br /> manufacturer. <br /> 1. Avoid direct contact with the material. Prolonged or repeated contact can cause skin irritation. ' <br /> If prolonged contact is anticipated, impervious gloves should be worn. <br /> 2. In a confined space at temperatures greater than 212°F (100°C), sufficient vapors can ' <br /> accumulate and flash if a source if ignition is present. TUFF-N-DRI Membrane will not support <br /> sustained combustion, and will not burn under normal circumstances. ' <br /> 3. Mist from spray application in a confined area can possibly cause a headache, nausea, and <br /> irritation of the nose, throat and lungs. To prevent this, a dust mask or cartridge respirator may ' <br /> be worn but is not required. <br /> 4. To protect the eyes from contact with high-pressure spray, wear chemical safety glasses with <br /> side shields. If contact with eyes occurs, flush with large amounts of cool water while holding � <br /> eyelids open. Get medical attention if irritation persists. <br /> Application Instructions <br /> � <br /> Preparation and Limitations ' <br /> 1. The block, parged block, poured concrete or pre-cast concrete must be clean, smooth, firm, <br /> free of dust, mud, ice, snow, loose mortar, wires, fins, metal projections, wall ties, or any other <br /> substance which might prevent placement and bonding of a continuous film. Take particular care , <br /> to ensure that the footing and/or cove area are clean. <br /> 2. On poured concrete walls, remove wall ties on the outside and inside of wall. This must be done , <br /> prior to the application of TUFF-N-DRI Membrane. <br /> 3. On poured concrete walls, the tie holes must be patched with hydraulic cement, vinyl concrete ' <br /> patch, or non-shrinking grout. Flat snap ties that break off cleanly without chipping the <br /> surrounding concrete, only require pre-spraying with a 10 to 15-mil wet coating of TUFF-N-DRI <br /> Membrane, but may be treated as above as well. Whichever method the applicator chooses, the ' <br /> tie holes must be prepared prior to the standard 60 mil wet application. Honeycombs or voids in <br /> the wall must be patched with hydraulic cement, vinyl concrete patch, or non-shrinking grout. ' <br /> 4. For bare block walls, all mortar�oints between the masonry units shall be compressed and <br /> tooled or struck smooth. All voids in the mortar joints between masonry units shall be patched , <br /> with hydraulic cement, vinyl concrete patch or non-shrinking grout. <br /> 5. For parged block walls, the parging must be firm and smooth. It must not crumble to the touch or , <br /> have too high of a sand content. Any patching of the parging must be done with hydraulic <br /> cement, vinyl concrete patch or non-shrinking grout. <br /> 6. For block or parged block walls, find out whether any or all of the cores of the block foundation ' <br /> are to be filled with concrete. If any of the cores are to be filled, the filling must be completed <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.