Laserfiche WebLink
. <br /> , � 3�� <br /> �� <br /> CITY OF ORONO SEPTICSYSTEMPERIVIITAPPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, 1V�i 1 55323 <br /> JOB STTE ADDRESS: ��' a•� �0�� S�o�� �i� <br /> Occupancy Type: Residential �� Commercial Other <br /> Permit T e: New or Replacement System, $100.00 �^ <br /> yp $ 50.00 <br /> Repair E�dsting System, - <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Name: 1�IU2/�� LcvS <br /> Phone Number: <br /> Mailing Address: �y������ '�� � City: CyLo� -- �P� <br /> Contractor's Name: c.��.�-L ��� PhoneNumber:_��%6 if�ss` <br /> Mailing Address: �'C� ,.�� ais _ City:s%.�✓�__ �� �s�� <br /> DO NOT MAIL PAYMEN'T WITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4, The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. ection is re uired <br /> C. Drainfield trench installation prior to covering. For mounds, insp q <br /> after rough-up but prior to sand placement (san.d will be jar tested for silt content), <br /> and again during pressure distribution piping installation in � rock be�d• S�tion <br /> D. Final inspection to verify proper final cover depths and to veri that all ump <br /> (where required) components are functional and comply with codes. <br /> 5, Individual holding NIPCA Installer Certificate shall be present during inspections: A 24- <br /> hour notice is required for all inspections- <br />