My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-007235 - new septic
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2425 North Shore Drive - 09-117-23-44-0003
>
Septic
>
1995-007235 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:51:29 PM
Creation date
10/5/2017 12:40:13 PM
Metadata
Fields
Template:
x Address Old
House Number
2425
Street Name
North Shore
Street Type
Drive
Address
2425 North Shore Dr
Document Type
Septic
PIN
0911723440003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, � . F-17 <br /> PiTMP SEL,ECTION PROCEDURE <br /> � �. F1dD PERFORATtON OF p PERFORATED LeTEpoL <br /> A. Determine pump capacity: �-� <br /> Gravity Distribution i�� <br /> 1. Minimum suggested is 600 gailons per hour(10 gpm)to stay ahead of _ -:. - ' a�..N�w�,k�,,,,,- <br /> water use rate. �. "'�"�`""� `��°"`°��°'••"�""�" <br /> � .�,��,«�,�..� <br /> 2.. Maximum suggestedfo�de ivery to a drop box of a home system is 2,700 _. . ��•��a"'�'"°��_°^'°'� <br /> Nb C00 fie� Tey <br /> gallons per ho (45 m) prevent build-up of pressure in drop box. ,:.,•�,,„ �-.,�.�.� �:•�e Eaa. <br /> .. o n Nla M! ef Nect LN�r <br /> , . ... PY/pv/1pr LDcatM el <br /> Pressure Distibution �"°"5"'°�°„ �•��""«`.�."� <br /> 3.a. Select number of perforated laterals . ' <br /> b. Select perforation spacing= ,--- fee� ����b'M►�,'�„`„"��"° <br /> c. Subtract 2 h.from the rock layer lengih. <br /> ����-feet <br /> d. Det rnune the number of spaces between perforations. <br /> Length perf.spacing= .ft._+_„�lt�- spaces Requ�d Prrfor�eo�D����� <br /> e. spaces+ 1_= perforations/lateral u+galloro per aunute(gpm <br /> f. Multiply perforations per lateral by number of laterals to �H�e �Zm��,, `ad� <br /> get total number of perforations. �,�,,,, x �;����'�- `-perforations. �f�c> <br /> g �" XT� gP�� 1.Oa 0.56 0.74 <br /> SELEC'TED PUMP CAPACTTY �-1� gpmm�-x • 2.�b �.8� 1.�4 <br /> B.Determine head requirements: ' a.Use for single family homes <br /> 1. Elevation difference between pump and point of discharge. b.Use for all other applications <br /> �_feet <br /> 2. If pumping to a pressure distribution system,five feet for pressure <br /> required at manifold if gravity system,zero. <br /> --- feet <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. , p'P�L�B� , <br /> Read friction loss in feet per 100 feet from table. � � Po�n�of D�schars� <br /> F.L._, 3.��ft./100 ft of pipe ' ��I <br /> b. Determine total pipe length from pump to discharge Elevation Differcnce� - <br /> point. Add 25 percent to pipe length for fitting pi,n,p 7,2 <br /> loss,or vse a fitting loss chart. Equivalent pipe <br /> length-1.25 times pipe length= F-18b <br /> "� !� x1.25= 39 � feet <br /> 1.5 inch 2.0 inch 3.0 inch <br /> c. Calculate total friction loss by multiplying � Friaim loce pa IOOft of pipe <br /> . friction loss in h/100 h by equivalent ipe length. 10 0.69 0.20 <br /> Total friction loss= "�`1� x 3.� � +100= /J feet 12 0.96 0.28 <br /> 4. Total head required is the sum of elevation difference, t4 1.28 0.38 <br /> special head requirements,and total friction loss. 16 1.63 0.48 <br /> 18 2.03 0.60 <br /> 20 2.47 0.73 0.11 <br /> �a _+ - +� 25 3.73 l.il 0.16 <br /> (1) (2) (3c) 30 5.23 1.55 0.23 <br /> 35 7.90 2.06 0.30 <br /> 40 11.07 2.64 039 <br /> TOTAL HEAD �feet 45 1a.73 3.28 0.48 <br /> 50 3.99 0.58 <br /> 55 4.76 0.70 <br /> C. PumP Selection 60 5.60 0.82 <br /> 1. A pump must be selected to deliver at least <br /> y� gpm (Step A) with at least �feet of total head (Step B). <br /> m r.�,�C.• <br />
The URL can be used to link to this page
Your browser does not support the video tag.