Laserfiche WebLink
FEB-20-2901 14�31 MINNEHAHA CREEK WATERSHED 6124710682 P.05/05 <br /> � <br /> Perm,it AppIication No.: 01-023 R�il�: B,N <br /> Applicant: Minnetonka Center for the Arts R�ccived: l/29/U1 <br /> Project: New facilitv on a developed pronei-tr Comlalete: 2/1/01 ' <br /> Lacation: 2440 North Shore Drive, Orono Mailing Date: Zl12/O1 <br /> Recommendation: <br /> Approval in accordance with submitted application and plans. Permit should�ot be issu�d until <br /> the following conditions aze met: . <br /> 1. A surety of$2,500 for erosion control and$6,000 for sioniiwater mana�ement must be <br /> recei'ved. <br /> 2. A maintenance agreement for the retent�on pond and rain �ardens m��st be executed and <br /> recorded. <br /> 3. Rule J fees must be paid. <br /> Background: <br /> The proposed project is the consttuction of a new Minnetonka C�nter for the Arts Facility near <br /> North Shore Drive and Briar Street in Orono. No wetlands are lacated on the site. The site is <br /> about 6 acres in size. The project has received Planning Com�l�ission and City Council appro��al. <br /> Rules B and N apply. <br /> Ru.le B • <br /> The erosion control plan meets Rule B requirements and incluc�c� silt fence w�here neeessary,a <br /> rock construction entraaee,and h�aybale pmtection around catch hasins. A surety of$2,500 is <br /> required. <br /> Rule N <br /> This project requires B1VIps and ratc eontrol. �MPs proposed (ur the project include four rain <br /> gard.ens. Rate control is provided by a stormwater retention pan�l_ The pond iias a a 4 foot 10:1 � <br /> bench. Runoffrates at each poinc exiting the site will decreas�� li�r che 1, 10, a�id 100-year <br /> events. Overall rwioffrates from tUe site will decrease bv 72 ��rr��nt for the 1-year event and by <br /> 46 percent for the 100-year event. Excess wa.tet in the rain gard�ns will drain into the retention <br /> pond. Drainage from the retention poad will run to a drainage e�sement on the neighboring <br /> property to the nortla. The City of Oron�has confirmed that th��� have a drainage easement over <br /> the land to the north of the property. Neighbors have r�ised conc�,ns that the project could be <br /> increasing the runoffto the properties to the north and that the uu�let from tlie proposed pond <br /> would cause erosioa in the cirainage easement to the north of tl,e Property_ However,rates will <br /> not increase to any of the nei�hboring properties and a visit to tli�• site indicated that the drainaae <br /> easem�nt receivi.ng water from th�pond is naturally veaetated u,�tl should be able to withstand <br /> flow from the pond. <br /> ,y <br /> T:\0185\01\l S I�APPOI 0?3 . � <br /> 02/l5/Ot <br />