� Bonestroo.Rosene,Anderlik and Associates.Inc.is an Affirmative Action/Equal OpportunitY Employer
<br /> � Bonestroo �nd Employee Owned
<br /> Principals:Otro G.Bones[roo,PE.• Marvin L.Sorvala,PE.•Glenn R.Cook,P.E.•Rober[G.SchunichC P.E.•
<br /> 0 Rosene lerry A Bourdon,PE
<br /> Anderlii< & Senior Consultants:Rober[W Rosene,PE •Joseph C Anderlik,PE •Rithard E Tumer,PE• Susan M Eberlin,C PA.
<br /> � Associate Principals:Keith A.Gordon,PE.•Robert R.Pfefferle,PE.• Richard W.Foster,P.E.•David O.Loskota.PE.•
<br /> Associates Mark A Hanson,PE • Michael T Rautmznn,PE • 7ed K Field,PE • Kenne[h P Anderson,PE •Mark R.Rolfs,PE •
<br /> Devia A.Borestroo,M.B.A.• Sidney P Williamzon,PE.,LS.� Agnes M.Ring,M.B.A.•Ailan Rick Schmidt,P.E.•
<br /> Engineers & Arehiteets Thomas W.Pe[erzon,PE.• Jamez R Maland.PE • Miles B.Jensen,P.E.• L.Ph�llip Gravel III,P.E.• Daniel J.Etlgerton,PE.•
<br /> Izmael Mar[inez,FE.• Thomas A.Syfko,PE.•Sheldon J Johnson• Dale A.Grove,P.E.• Thomas A.Roushar,P.E.•
<br /> Robert J.Devery,PE.
<br /> Offices:SL Paul,St Cloud,Roches[er and Willmar,MN• Milwaukee,WI• Chicago.IL
<br /> F�UQLl$I 2,1, 2�� Website:wwwbonestroo.com
<br /> Paul Weinberger
<br /> Zonin�Administrator/Planner �- .. _. , ,y��
<br /> City of Orono
<br /> Post Office Box 66 ; ;�na
<br /> Crystal Bay, �1N 55323
<br /> v�f Y Ui=(,7F�Cy��C)
<br /> Re: 1�linnetonka Center For the Arts �v��0 �d . .S/f OR� ,��2�-�Cf
<br /> I'1lC'1�i0. 1 Jy-L�I O
<br /> I)ear Paui:
<br /> W e ha��e ccmFlete-�a site inspe::tion at the titinnetonka Center for ihe rlrts property.The site is located west of C.R. ':�6
<br /> and north of C.R.51 in the southwest quarter of Section l0.The followin�items need to be repaired or corrected before
<br /> final City acc�ptar.ce of the project: �
<br /> 1. Th� sr�en de�d i�`orway Pir.cs surounding[he pond need to be remove� aud repiaced. '
<br /> :�. Silt and sediments need to be excavated from the pond at both inlets to the pond.
<br /> 3. �.rip iapped emeroency overflow should be installed alon�the north si�e of the pond at an elevation 02-feet
<br /> h.i;!;er thln th_outlet s[ructu�e i�!e? Qrate.
<br /> d. Veeetation has not yet been estabii�hed over the entire site.There was no evidence of any topsoil in any of'he
<br /> sreas that have be�n seeded.A minimum of 4-inches of topsoil should'be placed over ali seeded areas and those
<br /> areas reseeded and ferti!ized.This work should be completed prior to September 15,2002 to establish growth
<br /> t��;. �-� �-.
<br /> �. Silt f�nce shculd be installed ad�acent to ali rainwater�ardens and por_ding areas to protect the ba;.ins from
<br /> sedimentation. The silt fence shall be maintained until vegetation is established.
<br /> 6. Al;rainwater�ardens have been silted in and need to be excavated.The rainwater gardens alon;the south side
<br /> of tne bu:ldino have been piug�ed with wood chips and mulch washed into the basins f;om the surroundin2
<br /> Ia�::l�capinJ.Th,; wood chips, mulch and day lilies surroundin�the raim.Nater�ardens should be removed and
<br /> r�placed with sod or some plantings that don't require mulch and wiil resist ero;ion.
<br /> 7. A low area east of the buildino near the south end of the newly graded s���ale doesn't drain.The swale sh�uld be
<br /> reQraded or the draintil�extended southerly to provide drainase to this area.
<br /> H. A lotiv area:;outh of the buiidino and west of the main entrance is holding�.�ater.This area should be g:aded t�
<br /> drain to t;�e rainwater garden to the sou,h.
<br /> Please conta�t me at(o�i)604-4865 if you have any questions re�ardin�this matter.
<br /> Youn ver� trufv,
<br /> f30NESTR00, ROSENr, AiJDERLIK&ASSOCIATES, [�'C.
<br /> /P�
<br /> Tom Kello�
<br /> Cc: Gre� Gappa, L}�le Oman, City of Orono
<br /> C,eon Henrickson. A1..�. bl,,rtenson (by fax 61?.333.�?6?)
<br /> Rrx��nne H�.awn, h[innetonna Cenrer for the Art; (by fa.r 9��.-t73.7363)
<br /> 2335 West Highway 36 . St. Paul, MN 55113 . 651-636-4G00 . Fax: 651-636-1311
<br />
|