Laserfiche WebLink
M�. Gary Gleason, P.E. 2 January 17, 2001 <br /> GME ProjeCt No. 9256 <br /> of automobiles and light trucks (pick-ups and vans) , with occasional <br /> heavier vehicles such as waste collection trucks, delivery trucks . A <br /> riprap lined infiltration trench for stormwater disposal is planned in <br /> the southeast corner of the site . <br /> The purpo�es of this report are to describe the soil and groundwater <br /> conditions encountered in our subsurface exploration; to review and <br /> evaluate these conditions with respect to the proposed project; and to <br /> present r�commendations for methods of foundation and earthwork design <br /> and cons�ruction. <br /> FIELD EXPLORATION <br /> We drilled 12 borings for this project, as shown on the enclosed Soil <br /> Bqring Location Diagram. We suggested the number, depths, and locations <br /> o� the borings, based on the site plan for the new structure. We located <br /> the borings in the field by measuring from the existing building, using <br /> d�mensions scaled from the site plan. <br /> Our crew shot surface elevations at the borings in NGVD referenced to the <br /> f�rst floor of the existing building at the entrance on the south side. <br /> T�e elevation at this location is approximately 966 NGVD. Before we <br /> drilled, we contacted Gopher State One Call to locate public underground <br /> utilities. <br /> BM!CONWITANTl,INC. <br />