My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Regarding roof drains
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2240 North Shore Drive - 10-117-23-32-0019
>
Misc
>
Regarding roof drains
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:26:25 PM
Creation date
10/4/2017 11:43:13 AM
Metadata
Fields
Template:
x Address Old
House Number
2240
Street Name
North Shore
Street Type
Drive
Address
2240 North Shore Drive
Document Type
Misc
PIN
1011723320019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
new building as a portion of the existing building during construction. I believe this is allowed in <br /> the Building code in Section 503.3. <br /> To recap the other issues we discussed during the meeting on the Sth Oct. 2000. <br /> The Art Center will be a mixed use occupancy. It will include a Group E occupancy for the <br /> classroom areas, Group A.3 for the exhibit and dining areas, and Group B for the 2nd floor office <br /> area. <br /> There will be a Hallway running from the front entry North to the Classroom area,then running <br /> East West to connect the Classroom areas. This can be a Hallway,not a corridor,because all of <br /> the classrooms exit directly onto grade ;and the entire building will have an automatic sprinkler <br /> system. <br /> The areas which will need one hour separations will be: <br /> around the Mechanical rooms,the elevator shaft, and the exit corridor on the north side of the <br /> Dining room. (In addition to the Sculpture Room covered above). <br /> The mechanical system is a heat pump system. The chiller will be in the cooling tower and the <br /> make up air handlers will sit on the roof where they are required. The air handling units will be <br /> in the spaces where they are required. <br /> The building will be clad with galvanized wall panels,exterior steel panels, and an exterior wood <br /> composite paneling. <br /> The roof will predominantly be a flat roof with a 1/4" per foot slope. The roof will drain through <br /> scuppers and downspouts. The other areas of the roof will be a galvanized standing seam roof. <br /> Lyle will review the drawings further,and review them with the Fire Marshal. We will schedule <br /> another meeting to review further developments,and as the design of the building progresses. <br /> This information represents our understanding of the discussion that took place at the referenced meeting. <br /> Please contact me with additions or changes within 10 days of receipt of these minutes. <br /> Prepared by <br /> Patrick Regan <br /> James Dayton Design LTD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.