Laserfiche WebLink
� � Bones[roo,Rosene,Anderlik and Associates,Inc.is an Affirmative Action/Equal Opportunity Employer <br /> �Bonestroo O[[o G.Bonestroo,P.E. Howard A.Sanford,P.E. Michael C.Lynch,P.E. Brian K.Gage,P.E. <br /> Robert W.Rosene,P.E.' Keith A.Gordon.,P.E. James R.Maland,P.E. F.Todd Foster,P.E. <br /> Rosene Joseph C.Anderlik,P.E. Robert R.Pfefferle,P.E Jerry D Pertzsch,P E. Keith R.Yapp,P.E. <br /> � Marvin L.Sorvala,P.E. Richard W.Foster,P.E. Scott J.Arganek,P.E. Douglas J.Benoit,P.E. <br /> Anderlilc & Richard E.Turner,P.E. David O.Loskota,P.E. Kenneth P.Anderson,P.E. Shawn D.Gustafson,P.E. <br /> Glenn R.Cook,P.E. Robert C.Russek,A.I.A. Mark R.Rolfs,P.E. Cecilio Olivier,P.E. <br /> Thomas E.Noyes,P.E. Jerry A.Bourdon,P.E. Mark A.Seip,P.E. Kent J.Wagner,P.E. <br /> AssociatesRobert G.Schunicht,P.E. Mark A.Hanson,P.E. Gary W.Morien,P.E. Paul G.Heuer,P.E. <br /> Susan M.Eberlin,C.P.A.* Michael T.Rau[mann,P.E. Paul J.Gannon,A.I.A. John P.Gorder,P.E. <br /> Enineers & Architects "Senior Consultant Ted K.Field,P.E. Daniel J.Edgerton,P.E. Dan D.Boyum,P.E. <br /> g Thomas R.Anderson,A.I.A. A.Rick Schmidt,P.E. Jeffrey J.Ehleringer,P.E. <br /> James R.Rosenmerkel,P.E. Dale A.Grove,P.E. Joseph R.Rhein,P.E. <br /> Donald G.Burgardt,P.E. Philip J.Caswell,P.E. Lee M.Mann,P.E. <br /> Thomas A.Syfko,P.E. Mark D.Wallis,P.E. Charles A.Erickson <br /> September 21 1995 Frederic J.S[enborg,P.E. Miles B.Jensen,P.E. Leo M.Pawelsky <br /> � Ismael Martinez,P.E. L.Phillip Gravel,P.E. Harlan M.Olson <br /> Michael P.Rau,P.E. Karen L.Wiemeri,P.E. Agnes M.Ring <br /> Thomas W.Peterson,P.E. Gary D.Kris[ofitz,P.E. James F.Engelhardt <br /> Mr. Lyle Oman, <br /> Building Official <br /> City of Orono <br /> Post Office Box 66 <br /> Crystal Bay, Minnesota 55323 <br /> Re: 1569 North Farm Rd. <br /> File No. 139-Gen <br /> Dear Lyle, <br /> We have reviewed the proposal to install a second culvert under Long Lake Road and excavate <br /> the ditch along County Road 6 to provide an adequate outlet for the existing wetland on Lot <br /> 8, Block 1, The Farm at Long Lake. The initial calculations done by Mr. Nels P. Nelson, <br /> BARR Engineering Company and the recent letter by Stephen M. Johnston, Landform <br /> Engineering Company appear acceptable from an engineering standpoint. The house walkout <br /> elevation should be set no lower than elevation 988.5, as determined by Landform Engineering <br /> Company. This will provide approximately one foot of freeboard above the calculated 100-year <br /> flood elevation. The homeowner should be advised that one foot of freeboard may not be <br /> adequate protection from flooding during a larger frequency storm event. <br /> Silt fence should be installed at the downstream limits of the proposed grading prior to <br /> commencing with the work. Long Lake Boulevard must be repaired to its original cross-section <br /> or to a minimum of six inches of Class 5 aggregate base and 4.5 inches of bituminous mixture <br /> (1�pe 41)whichever is greater. Bituminous mixtures must be placed in lifts not exceeding three <br /> inches in thickness. All backfill below the Class 5 aggregate must be granular borrow material <br /> :neeting MnDOT Specification No. 3149. Access along Long Lake Boulevard must be <br /> maintained at all times, keeping one iane af traffic �pe::. '?'.rr�ffic control must be installed and <br /> maintained in accordance with the MMUTCD. T'he City should be notified for inspection at <br /> least 48 hours prior to removing the surface of Long Lake Boulevard. We would recommend <br /> a $10,000 letter of credit be provided to the City to insure that the work is done satisfactorily. <br /> Please contact me at this office if you have any questions regarding this matter. <br /> Yours very truly, <br /> BONESTROO, ROSENE, ANDERLIK& ASSOCIATES, INC. <br /> ��,��Y� �'�' . '`�-��`� <br /> Shawn D. Gustafson, P.E. <br /> 2335 West Highway 3G ■ St. Paul, MN 55113 ■ G12-G3G-4G00 <br />