Laserfiche WebLink
� ���� <br /> _ ,M,.. <br /> • <br /> • SEPTIC SYSTEM PERNIIT APPLICATION <br /> CITY OF ORONO <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, N1'�i t 5�323 <br /> . �� ��,�- ��- - <br /> JOE SITE ADDRESS. �(� � <br /> Occupancy Type: Residential � Commercial Other <br /> Permit T e: New or Replacement System, $100.00 k <br /> yp $ 50.00 <br /> Repair Existing System, <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Name• /� PhoneNumber: �.Zv-G�'%/ <br /> Mailing Address: ' �,.,,,Q._ City:�� �P���l.�. <br /> Contractor's Na�me• PhoneNumber: y7i- ���• — <br /> Mailing Address: � City: �P_���'�.�. <br /> DO NOT MAIL PAYMENT WITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS <br /> 1, Applications for septic system permits may be mailed or submitted in person at the City <br /> O�ces; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City O�ces and work must not begin unless the permit card is on the job <br /> site. <br /> 2, permits will be issued only to contractors holding a Ciry of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4, The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> g, Tanic installation prior to covering. ection is re uired <br /> C. Drainfield trench installation prior to covering. For mounds, insp q <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5, Individual holding MPCA Installer Certificate shall be present during inspections: A 24- <br /> hour notice is required for all inspections. <br />