Laserfiche WebLink
GeoLink Design Studio � • <br /> �...,�...��- <br /> Project Summary <br /> Project Information <br /> Analysis Prepared for: <br /> Name: HENDEL Name: AIR MECHANICAL INC <br /> Address: Address: 16411 Aberdeen st <br /> , Ham Lake,MN. 55304 <br /> Phone: Phone: 763-434-7747 <br /> Work: Fax: 763-4341699 <br /> Notes: Cell Phone: 612-363-3536 <br /> Project#: 1 Comments: <br /> System Design Data <br /> Design Data: Comfott Conditions: <br /> Heating Load: 117,289 Btuh Heating Setpoint: 70 °F <br /> Heating Temp Diff: 68.0 °F Cooling Setpoint: 75 °F <br /> Cooling Load: 68,370 Btuh Start Cooling Temp: 75 °F <br /> Cooling Temp Diff: 17.0 °F HW Temp Setting: 130 °F <br /> Constant Fan: No HW Users: 4 people <br /> Design City: MINNEAPOLIS, MN Annual Load: <br /> Winter Design: -12 °F Heating: 272.6 million Btu <br /> Summer Design: 92 °F Cooling: 30.9 million Btu <br /> Bldg Bal Temp: 58.7 °F Hot Water: 22.1 million Btu <br /> Intemal Gains: 19,526 Btuh HW Use-Daily: 70.0 gallons <br /> Utl�l�l COStS <br /> Rate Summer Winter Rate Summer Winter <br /> Electric-Geo $/kWh 0.09 0.09 Natural Gas $/CCF 126 126 <br /> Electric-Heat Pump $/kWh 0.09 0.09 Propane $/gal 2.00 2.00 <br /> Electric-Furnace $/kWh 0.11 0.11 Fuel Oil $/gal 2.00 2.00 <br /> Operating Costs <br /> System Description Efficiency Heating Hydronic Cooling Hot Constant Total HVAC <br /> Htg/Clg(%) Cost Cost Cost Water Fan Operating monthly <br /> Cost Cost <br /> Envision ND Dual Capacity 3.39/20.71 :��,;�� - y�;:%� W���: - �1,��6 $2�; <br /> Series 11Tons with <br /> Horizontal Bore-0.75"PE <br /> Envision NDZ Dual 2.55/14.97 $z,751 - $186 $273 - $3,2�0 $268 <br /> Capaciry Series NDZ072 <br /> with Horizontal Bore- <br /> 0.75"PE <br /> Gas-90%/SparkCond- 0.89/10.58 $a,142 - $321 $476 - $4,938 $412 <br /> PSC with 13 SEER/Single <br /> Stage-R410A PSC <br /> Note:Due to variability in weather,system installation,and living habits,this analysis is to be considered an estimate only <br /> Job Name: HEDEEN Project#: 1 <br />