My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01147 - septic
Orono
>
Property Files
>
Street Address
>
N
>
North Arm Lane
>
360 North Arm Lane - 06-117-23-24-0012
>
Septic
>
2011-01147 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:46 PM
Creation date
9/27/2017 1:53:23 PM
Metadata
Fields
Template:
x Address Old
House Number
360
Street Name
North Arm
Street Type
Lane
Address
360 North Arm La
Document Type
Septic
PIN
0611723240012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� _ • � <br /> . LNI�ERSITY <br /> OF �I N V ESOTA OSTP Field Evaluation Form <br /> 1.Caiitact informatia� v 11.05.31 <br /> Property OMrtier/C(ient Tony lund CtienY Phone Number.612-751-2�6 <br /> Address <br /> Date 9/23/2011 Weather Conditions <br /> 2. Utility and Sirudure lnformation <br /> 'lity Locations identified � Gopher State One Call il 651-454-0002 +�Y�vate Utitities N� <br /> Property Lines � Determined and Approved By ClienL Ci�ent's x�raval jirattat) <br /> Determined But Not Approved � <br /> Approximate <br /> ✓ Property Lines Surve9red <br /> � Locate and Verify(see Site Evaluation�p) <br /> � Existing Buildirigs improvements Easements � Setbadcs <br /> 3. Site hifortnation <br /> Percent Slope 8% Slope Direction ��rt1i <br /> Landscape position Slope Shape Shoulder <br /> Vegetation type(s) �rass <br /> Evidence of cut,fiU,compacted or disturbed areas Yes � No Locate Areas on Site Evaluation Map <br /> Discuss the flooding or run-on potential of site None <br /> Identify benchmarks and elevations(Site Evaluotion Map)Well Top <br /> Proposed soil treatment area adequately protected Y� '' � <br /> 4. Generat Soifs tr►formation <br /> Original soils Yes � No <br /> Type of observation �Soit Probe Soit Bair� Soil Pit <br /> Number of soit observatiau a <br /> Soit observatiais were conducted in the proposed system tocation �Y� �'�O <br /> A soil observation was made within the most timiting area of the proposed system � Yes P�° <br /> Soil boring tog forms com�eted and attached '' Y� N° <br /> Percolation tests performed,forms completed and attached Yes � No <br /> 5. Phase i.Reportitig Information <br /> Depth to standing water 0 inches Antidpated construction fssues <br /> Ftood elevation 0 feet <br /> Depth w bedrock 0 inches <br /> Depth w periodically satureted soit 1.4 inches <br /> Maximum depth of system Mound inches <br /> Elevation at system bottom 95.5 feet Differences between soSl wrvey and field evaluation <br /> Percolation rate min/inch <br /> Loading rate 0.6 gpd/ft2 <br /> Contour Faading rate 12 gpd/ft <br /> Site evaluation issues/comments <br /> I hereby certify that I ha�completed this woric in accordance with all applicabte ordinances,rules and faws. <br /> v ,�., /�� ��� � ' � -�-3 -,2�i/ <br /> �///a / .wa' ✓. <br /> � (Designer) ' ` (Signature) —`— (License#) (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.