Laserfiche WebLink
,(z�' ��s�c, 1 n-1y�-rrz <br /> . , . . . . I <br /> _ , ; <br /> � <br /> S-P TESTING, INC. <br /> 951 KATYDID LANE . <br /> ST. M16HAEL, MN 55376 <br /> 497-3566 ' <br /> Steven I3. Schirmers , ; � ' <br /> � , <br /> November 20,; 1989 � <br /> Don Peterson � ' <br /> , i <br /> Lot 2, Block 1, South site � <br /> North Arm Est. , 2nd Add. " <br /> Orono, Henn. Co. , MN <br /> This system is Designed for a Type 1, Five bedroom home and in accordance <br /> with the Minnesota Pollution Control Agency Chapter 7080 and local ; <br /> ordinances. <br /> The soils on this site are typical of SCS soils mapped - KIC2 - - <br /> Kilkenny clay loam. ,A seasonally high water table was located at j <br /> 12" , 16" , 18" & 20" , (mottled soil) . Due to the seasonally high i <br /> water table, a pressurized mound system will need to be installed. <br /> The bottom of the rock bed must be located at least 3 ' ab,ove the , ; <br /> seasonally high water table. <br /> . ; . <br /> The soils at a depth of 12" & 18" have a percolation rate averaging ' ' <br /> 5 . 1 min/inch and are adequate for treating septic effluent. i , <br /> • A pumping chamber will need to be installPd to lift the effluent to the <br /> treatment area. <br /> The manifold and supply line pipe must have back drainage to the pumping ' <br /> chamber. The distribution pipes shall have their ends capped. Be sure <br /> the rock and sand fill material are clean. The sod layer below the <br /> entire mounded area must be turned over, just break up the sod, be sure � , <br /> not to over work. <br /> ; ' <br /> The power supply and switches must be located outside the manhole and � <br /> pumping chamber in a weather proof enclosure. A warning device must be � <br /> installed with a light and sound device, this is in case of a pump failure. i ' <br /> (Mercury floats are a good method) . ' <br /> All neighboring wells are located more than 100 ' away from the proposed <br /> treatment area. <br /> Keep all heavy equipment off of the proposed treatment area before and <br /> after construction as much as possible. The treatment area should be ' <br /> marked off before construction. - j <br /> . ! <br /> CONT'D � <br /> Soil and Percoldtion Tetts <br /> Septic System Desi�n , <br />