Laserfiche WebLink
o Q � � � � <br /> FINAL GRA� � . INC_ <br /> The Buildina Materials: <br /> • Excavate the silt and mud. Export off site. <br /> • Import topsoil (structural) blended and screened with no rocks or sticks, <br /> • The three washout areas are 35 x 40. <br /> • The geostructural product will be staked deep. See brochure on product. <br /> • 7:30 AM start time and 6:00 PM end time in the evening. No weekend work. <br /> � Start as soon as possible to gain the growing season for plant root structure. <br /> • We will practice minimal traffic impediment as we drop off and pick up <br /> equipment. There is room to load trucks at the driveway. <br /> • The site is quite private. Normal Skid Steer noise. All new tier 4 equipment <br /> deletes any smoke smell. <br /> RECEIVED � <br /> APR 19 2017 <br /> C1T�l OF ORONO <br /> 3441 Bluff Drive • Jordan, MN 55352 � � � � � <br /> 952-492-5100 • Fax 952-492-5101 <br />