My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6789
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 6700 - 6799 (November 28, 2016 - October 9, 2017)
>
Resolution 6789
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2017 8:34:37 AM
Creation date
9/20/2017 2:11:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. 6789 <br />satisfaction of the city prior to release of financial security. <br />9. Additional approvals <br />a. Variance from the wetland setback <br />b. Variance of wetland buffer impact (Watershed District) <br />c. Conditional Use Permit for filling in the floodplain <br />d. Successful vacation of the existing Driveway easement (Doc. 1023891) <br />e. Successful realignment of a underground utility easement (Document Nos. 855727 and <br />862192) <br />10. The applicant had represented they have legal access. To the extent that the access rights <br />are modified through court order or other means, the plat would be voided. <br />11. The following estimated fees are due at the time of final plat unless otherwise noted <br />Stormwater and Drainage Trunk: The property will be subject to the Stormwater and <br />Drainage Trunk Fee (SW&DT Fee) on a per -lot basis at the rate of $3,025 per lot for this <br />half -acre zoning district ($6,050 total) per the 2017 Fee Schedule. <br />Water and Sewer: The property was fully assessed for municipal sewer in 1965, only the <br />Metropolitan Council SAC charge which is currently $2,485 per dwelling unit. City water <br />was installed in 1970 and the property was assessed for one unit; if more than one home is <br />built, a water connection charge of $4,240 for the second unit would be due at the time a <br />building permit is issued. <br />12. Council approval is based on the entire record, above Findings. <br />13. Any amendments to the plans which are not in conformity with City codes may require <br />further Planning Commission and City Council review. <br />14. Authorities granted by this resolution run with the Property not with the Applicants, but <br />are permissive only and must be exercised by filing a final Plat application within one year <br />of the date of Council approval, or the preliminary plat will expire on that date (September <br />11, 2018). <br />15. Violation of or non-compliance with any of the terms and conditions of this resolution may <br />result in the termination of any authority granted herein. <br />
The URL can be used to link to this page
Your browser does not support the video tag.