My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01415 - sewer connection
Orono
>
Property Files
>
Street Address
>
N
>
North Arm Drive
>
1151 North Arm Drive- 07-117-23-14-0052
>
Permits/Inspections
>
2015-01415 - sewer connection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:31:30 PM
Creation date
9/19/2017 11:55:23 AM
Metadata
Fields
Template:
x Address Old
House Number
1151
Street Name
North Arm
Street Type
Drive
Address
1151 North Arm Dr
Document Type
Permits/Inspections
PIN
0711723140052
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . + <br /> r <br /> DETER:NIINiNG P�RMIT FEES <br /> ❑ SAC Charge(2015 Ra � $2,485.00)_ $ <br /> (SAC Charge must acc an ewer permit applications unless prepaid) <br /> (Orono Ciry Staff can determine if applicable) <br /> (If not prepaid,a sewer connection permit will not be issued) <br /> �ewer Con ction/Disconnect/Repair($50.00/Per Stub) $ <br /> Pipe size�inches;material��9chd 40 air tested; cast iron <br /> t <br /> r ti / ' onnect/Repair(550.00/Per Stub) $ <br /> ' e i es;material Schd 40 air tested; copper <br /> ❑ Water Availability For Future Hook-Up to Water($50.00) $ <br /> Water Availabilitv Explanation: <br /> Contractor installed line to inside of house for future hook-up. <br /> This line will be inspected by the Public Works Department. <br /> Required Before Water Connection Permit is Issued: <br /> 1. Issue Water Meter&Hom Permit <br /> 2. Any Additional Connection Fees Paid(If Applicable) <br /> Issue Water Connection Permit: <br /> 1. Collect Permit Fee&Issue Water Connection Permit <br /> 1. SUBTOTAL of Permit Requested: $ <br /> 2. STATE SURCHARGE $ 1.00 <br /> 3. POSTAGE&HANDLING(Only on Maii-In Applications) $ 2.00 <br /> 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ �� � <br /> ADDITIONAL iNFORMATION— WATER METERS <br /> ■ WATER METERS must be picked up and paid for at Orono City Hall,these are on a s�arate permit. <br /> ■ WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of ineter installation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to do <br /> all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, and certifies th�all statements mad �s a ation are,true and correct. <br /> .�----- <br /> Applicant: Date: <br /> ( '- �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.