Laserfiche WebLink
, ����� ���� <br /> ����d�,��� <br /> Scope of Work for 680 North Arm Dr. J;�N ` J �017 <br /> C1Ty p� �RO,No <br /> Interior <br /> 1. Move two inner walls, none load bearing, as per plans. <br /> o Build one new hallway wall to complete small office <br /> • Result home goes from a 4 bedroom to a 3 bedroom <br /> 2. Remodel master bathroom, install new soaker tub, vanity with two sinks and toilet. <br /> o Create new shower, utilizing existing 2" waste and%" supply lines <br /> o Frame for new window <br /> o Extend one master bedroom wall 2 feet. <br /> o Install heated floor (electric) and tile <br /> 3. Create % bath, install toilet and sink. <br /> Exterior <br /> I. Remove existing siding. <br /> 2. Add 1" of Owen Corning FOAMULAR° 150 INSULATION board, to all warm walls, tape all <br /> seams <br /> 3. Install as per plans new LP Smartside LP Shake siding. <br /> 4. Replace or install a total of 13 new windows. <br /> 5. Install new metal roof over front entryway <br /> 6. Move and replace entry door, 3 feet out. <br /> a. Build footing matching and tied to existing footing and CMU wall to entry rough <br /> height. <br /> Work not being done as per plans. <br /> No new decking material or railing systems. <br /> No work to kitchen <br /> Total Budget$32,000 <br /> Contractor (Self) <br /> � <br /> Girard Remodeling LLC <br />