My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
N
>
North Arm Drive
>
580 North Arm Drive - 06-117-23-42-0005
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:28:31 PM
Creation date
8/29/2017 12:00:12 PM
Metadata
Fields
Template:
x Address Old
House Number
580
Street Name
North Arm
Street Type
Drive
Address
580 North Arm Dr
Document Type
Septic
PIN
0611723420005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
„ , ,7��P TESTING� �NC. Steven B. Schirmers • MPCA Cert.No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> FAX(612)-497-5011 <br /> State License#394 <br /> Aprii 29, 1998 <br /> Bryce Johnson <br /> 580 North Arm Drive <br /> Orono, Henn. Co., MN <br /> This site has an existing on-site sewage treatment system which is classified as failed <br /> due to not meeting a 3' separation from the bottom of the system and the mottled soil <br /> (highest known saturated soil). <br /> This on-site sewage treatment system is designed for a Type 1, four bedroom home, in <br /> accordance with the Minnesota Pollution Control Agency Chapter 7080 and local <br /> ordinances. <br /> The soils on this site are SCS soils mapped - KkB - Kilkenny loam. The seasonally <br /> saturated soils were located at 22” to 30" (mottled soil). Due to the seasonally saturated <br /> soils, a Pressurized Mound System will need to be installed to tneat septic effluent. The <br /> bottom of the treatment area must be located at least 3' above the saturated soils. The <br /> northeast comer of the system has 6"to 12" of fill soil with the original soil not being <br /> compacted. The fill soil will need to be removed with a backhoe prior to pfacing the <br /> washed sand for the mound. City approval will be needed to have the system 10' from <br /> the property line along North Arm Drive and the existing driveway. <br /> The soils at a depth of 12" have a peroolation rate averaging 9.5 mpi. <br /> The existing pumping chamber may be used upon approval from the local Inspector, the <br /> tank must be water tight. The pump may be used if it meets the required pump curve, <br /> gal/min & head pressure. The power supply and switches must be tocated outside the <br /> manhole and pumping chamber in a weather proof enclosure. A waming device must be <br /> installed with a light and sound device, this is in case of a pump failure. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.