Laserfiche WebLink
�°� <br /> , o 0 <br /> ;i ;����r:��{ ,� CITY of ORONO <br /> ,�� ��, � �;;�� E,► M��t� otn� <br /> �\,,.� /.�4 ~���•� f � <br /> \ .t � 1�1�k `�¢�G Street Addross: Maiitn�Add�ess: <br /> '9$'EgHO 2750 Kelley �a�kway �.0. 9ox 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> May 30, 2000 <br /> Thomas Mazer <br /> 560 North Arm Drive <br /> Mound, Mn 55364 <br /> Deaz Mr. Mazer: <br /> An inspection of your septic system was conducted on May 22, 2000. A summary of the inspection <br /> is below. <br /> Se�tic Tank Condition <br /> 1. Pumpout needed within one year(last pumpout date 9/27/91). <br /> The septic system is a compliant system, meaning it meets a11 or most cunent City and State <br /> Standards. Enclosed is a list of licensed contractors who work in Orono on a regular basis. This <br /> list is enclosed simply for your reference in case your septic system needs maintenance in the future. <br /> Also enclosed is a fact sheet explaining your septic system and how it functions. Finally, an as-built <br /> drawing is enclosed showing the approximate location of the septic system. <br /> If you have any questions regarding this report, please contact me at the City Offices at 249-4600. <br /> Re ect , <br /> Chris Pence <br /> On-Site Systems Manager <br /> Enclosures • <br /> In the event this inspection report is used to satisfy the requirements for a mortgage or other transfer of property, <br /> be advised that this report does no guarantee or certify the eaisting system will continue to function properly,but <br /> is merely an opinion of the adequacy of the system under current conditions based on the available information. <br /> This report must be kept on the premises with the system location and pumping records. <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www ci.omno.mn.us <br />