My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-005536 - new septic system
Orono
>
Property Files
>
Street Address
>
N
>
North Arm Drive
>
540 North Arm Drive- 06-117-23-31-0006
>
Septic
>
1993-005536 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:26:11 PM
Creation date
8/28/2017 11:53:52 AM
Metadata
Fields
Template:
x Address Old
House Number
540
Street Name
North Arm
Street Type
Drive
Address
540 North Arm Dr
Document Type
Septic
PIN
0611723310006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� • �y <br /> �' � � <br /> ` • <br /> � S-P TESTING, INC. <br /> 951 KATYDID LANE <br /> ST. MICHAEL, MN 55376 <br /> 497-3566 <br /> Steven B. Schirmers <br /> August 6, 1990 <br /> Paul Hanssen <br /> 520 North arm Drive <br /> Orono, Henn. Co. , MN <br /> This system is Designed for a Type 1, four bedroom home and in accordance <br /> with the Minnesota Pollution Control Agency Chapter 7080 and local <br /> ordinances . <br /> The soils on this site are typical of SCS soils mapped - LsC2 - Lester <br /> clay loam. A seasonally high water table was located at 18" , 24" , <br /> 26" , 28" , 32" & 40" , (mottled soil ) . Due to the seasonally high <br /> � water table, a Pressurized Mound System will need to be installed. <br /> The bottom of the rock bed must be located at least 3 ' above the <br /> seasonally high water table. <br /> The soils at a depth of 12" have a percolation rate averaging 6 . 8 <br /> min/inch and are adequate for treating septic effluent. <br /> A pumping chamber will need to be installed to lift the effluent to the <br /> treatment area. <br /> The manifold and supply line pipe must have back drainage to the pumping <br /> chamber. The distribution pipes shall have their ends capped. Be sure <br /> the rock and sand fill material are clean. The sod layer below the <br /> entire mounded area must be turned over, just break up the sod, be sure <br /> not to over work. <br /> The power supply and switches must be located outside the manhole and <br /> pumping chamber in a weather proof enclosure. A warning device must be <br /> installed with a light and sound device, this is in case of a pump failure. <br /> (Mercury floats are a good method) . <br /> All neighboring wells are located more than 75 ' away from the proposed <br /> treatment area. <br /> Keep all heavy equipment off of the proposed treatment area before and <br /> after construction as much as possible. The treatment area should be <br /> marked off before construction. <br /> CONT' D <br /> Soil and Percolation Teata <br /> Septic Syatem Deaign <br />
The URL can be used to link to this page
Your browser does not support the video tag.