Laserfiche WebLink
. � PRESSURE DISTRIBUTION SYSTEM �r,o PeRFaRaT�oN OF A PERFORATED LATERA� <br /> . �c.ass c�e. <br /> 1. Select number of perforated laterals 3 T,��� <br /> .. .�:;,.� <br /> � Lo sr of Geotaxtlle FaDric (u tar• <br /> 2. Select erforation s acin = 3 fee� > l-cumY Sand Loyar '. ��a,�a��Y a s„�,�,K,�, <br /> P P g ;�►h� ���� �,�,, <br /> Perforotion Drilled Horizonfolly <br /> 3. Since perforations should not be placed closer than 1 ft. to .,;Plus �`���r�C D A Le ctPl2•�o Edqo <br /> the edge of the rock layer (see diagram),subtract 2 ft. �OTTl -;:,:..:;:..F1i14�;..•; .< .;:. , ; ,.,','�,_ of Rock Layar <br /> the rock layer length. P�rforotlons lotofed at <br /> Cl�an Sand Loyer Bottom of �ateral <br /> �C� _::,:��.:..�.;.:. .r �.�.. .: .,:. .. . <br /> � —�ft. _ �� feet. Orlpiirol Soll Propsrly Scarifiad <br /> Rock layer length 8efae Placlnp Sond Layer <br /> Requlred Perforatio�Dkcharge <br /> 4. Determine the number of spaces between perforations. �n gallon+per minute(gpm) <br /> Divide the length above by perforation spacing and round °��` :�,�� ;,kh� <br /> down to nearest whole number. �f`�`' <br /> 1.Oa 0.56 0.74 <br /> Length perf. spacing = v� ft. T 3 ft. = i 6 spaces <br /> 2.Ob 0.80 1.04 <br /> �3� �2� a.Use for single family homes <br /> b.Use for all other applications <br /> 5. Number of perforations is equal to one plus the number of <br /> perforation spaces . <br /> Maximum number of quarter inch perforations pe <br /> �� spaces + 1 =_(�perforations/lateral lateral to guamantee<10%discharge variation <br /> Perforation <br /> _. 6. Multiply perforations per lateral by number of laterals to Sgf�jg 1� 1� 2 <br /> � ` get total number of perforations. <br /> 2.5 14 18 28 <br /> 3 x �� - s� erforations. 3.� 13 17 26 <br /> '�`��'$ �`"°`�`�'- P 3.3 12 16 25 <br /> 7. Determine required flow rate by multiplying 4.� 11 15 23 <br /> number of perforations by flow per perforation 5.Q 1Q 14 22 <br /> sr � <br /> P� X BPm�f--�gp�• wwr�.o �.oceho aT ew oF vatssu�asrn�eura�+ s�sreM <br /> � <br /> .�,�. <br /> 8. If laterals are connected to header pipe as shown on upper � <br /> example,to select minimum required lateral diameter;enter . �����`" <br /> table with perforation spacing and number of perforations ,,� �"` <br /> per lateral. Select minimum diameter far ��`°'� <br /> perforated lateral= I '/�- inches. <br /> 4TWT�Oi PEMOMTEO�V(I.�TE1145 NR <br /> MI[WML pST11yUfIOM W MOUMD <br /> �{I[11fOMtto RNTK/K <br /> v[w �fe ia'�'.,�"y r� .H/nr°�✓'°'��.+� <br /> �� 9. If perforated lateral system is attached to manifold pipe near ,,,,�,o �,,,...�-- <br /> the center,lower diagram,perforated lateral length and R,.�.,�.�.�.d .,.� <br /> number of perforations per lateral will be approximately one ` .,�.�.��;; <br /> half of that in step 8. Using these values,select minimum �,„�, �, <br /> diameter for perforated lateral= � �y inches. d,�.�`°`°�� �.,.��;,,.,r. <br /> ���� <br />