Laserfiche WebLink
„._�;::��,�.,}�,,.5 �-�-_� �._� - . .,.:_a..�� <br /> � �� � � <br /> ”' Daily Soil Observation Notes <br /> Project No: : Date: Report No: <br /> Project Name: Project Location: <br /> Client: Temp/We�ther: <br /> Project Manager: Time Arrived: Departed: <br /> i <br /> Areas Observed: ❑ Building Pad ❑House Pad ❑Roadway ❑Parking/Walks ❑ Footing �' <br /> ❑Proof Roll ❑Other(describe): <br /> Soil report available? ❑ Yes QNo Report reviewed? ❑Yes ❑No Report prepared by: <br /> Finish floor evaluation: eottom of footing elevation: Bottom of excavation elevation: <br /> Approved plans available? ❑Yes ❑No Specified compaction: Fill source: <br /> Oversizing appears adequate? ❑NA Q Yes ❑No Soils observed agree with Soils report? ❑Yes ❑No <br /> Soils appear adequate for design loads? C3Yes ❑No ProF�osed project bearing capacity(psf): <br /> Contractor notified of results? (]Yes ❑No Nam�e of person notified: <br /> Was a copy of this report left on site? _,�]Yes ❑No If so,whom wes it submitted to?� . <br /> x.' <br /> N ��. <br /> ,. <br /> _ s. <br /> ;� �� �; ��.:�� , , ; <br /> , .r . <br /> , .. <br /> : <br /> #,,. � � �, ; <br /> �=,. �. �M_ <br /> _ � �:, <br /> � <br /> � <br /> _� <br /> Notes/Comments: , ,, - '� � Ca "; i r'� .. ;,, , <br /> � . � ..F n. .i , <br /> .�'t <br /> � <br /> � �.." .r <br /> ', <br /> , ', .�/�/ <br /> Performed By: Reviewed By: Date: <br /> This is a preliminary report and is provided solely as evidence that field observations and/or testing was performed.Observations and/or conclusions and/or <br /> recommendation conveyed in the final report may vary from,and shall take precedence over,those indicated in a preliminary report. <br />