Laserfiche WebLink
• Piling Systems, LLC <br /> 250 Industrial Blvd, Young America, MN 55397 <br /> Phone: (612) 282-5883 <br /> Web: www.pilingsystemsmn.com <br /> Installation <br /> Owner/Contractor: Phill Otto Equipment: 247 Cat <br /> Date: 8/9/2017 Torque Driver: 7K <br /> Torque verified <br /> Site Address: 4116 Flighwood Rd,Orono By: John Newman <br /> Reference <br /> Operating Installer: John Newman elevation 100 <br /> Pile Shaft Top of Pile at <br /> Configuration: 2.875 x.211 bearing 99.50 <br /> Flight <br /> Kt Factor: 9 Configuration: 10-12-14 <br /> Top of pile Total length of Ultimate <br /> Pile# elevation after material Bottom of Excess pile cut Final pile length Final torque capacity <br /> driving required(ft) pile elevation off(ft) (ft-lbs.) (lbs.) <br /> 1 100.00 14.00 86.00 0.50 13.50 2780.00 25020 <br /> 2 100.66 21.00 79.66 1.16 19.84 4260.00 38340 <br /> 3 100.00 21.00 79.00 0.50 20.50 3700.00 33300 <br /> 4 0.00 -99.50 99.50 <br /> 5 0.00 -99.50 99.50 <br /> 6 0.00 -99.50 99.50 <br /> 7 0.00 -99.50 99.50 <br /> 8 0.00 -99.50 99.50 <br /> 9 0.00 -99.50 99.50 <br /> 10 0.00 -99.50 99.50 <br /> 11 0.00 -99.50 99.50 <br /> 12 0.00 -99.50 99.50 <br /> 13 0.00 -99.50 99.50 <br /> 14 0.00 -99.50 99.50 <br /> 15 0.00 -99.50 99.50 <br /> 16 0.00 -99.50 99.50 <br /> 17 0.00 -99.50 99.50 <br /> 18 0.00 -99.50 99.50 <br /> 19 0.00 -99.50 99.50 <br /> 20 0.00 -99.50 99.50 <br /> 21 0.00 -99.50 99.50 <br /> 22 0.00 -99.50 99.50 <br /> 23 0.00 -99.50 99.50 <br /> 24 0.00 -99.50 99.50 <br /> 25 0.00 -99.50 99.50 <br /> 26 0.00 -99.50 99.50 <br /> 27 0.00 -99.50 99.50 <br /> 28 0.00 -99.50 99.50 <br /> 29 0.00 -99.50 99.50 <br /> 30 0.00 -99.50 99.50 <br /> Notes: <br /> Finished floor referance is Basemsent slab at 100.00 <br />