My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-00747 - new structure
Orono
>
Property Files
>
Street Address
>
N
>
Navarre Lane
>
3320 Navarre Lane - 17-117-23-44-0059
>
Permits/Inspections
>
2014-00747 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:44:59 PM
Creation date
8/7/2017 2:08:09 PM
Metadata
Fields
Template:
x Address Old
House Number
3320
Street Name
Navarre
Street Type
Lane
Address
3320 Navarre Lane
Document Type
Permits/Inspections
PIN
1711723440059
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• � BOLTON 8�- M �N K , I NC� <br /> . Consulting Engineers & Surveyors <br /> '� 2638 Shadow Lane, Suite 200•Chaska, MN 55318-1172 <br /> Phone(952)448-8838•Fax(952)448-8805 <br /> www.bolton-menk.com <br /> August 6, 20]4 <br /> City of Orono <br /> Attn: Christine Mattson <br /> 2750 Kelley Parkway <br /> Orono, MN 55356 <br /> RE: Building Permit Application 2014-00747 <br /> 3320 Navarre Lane <br /> Engineering Review#1 <br /> Dear Christine, <br /> As requested, we have completed an engineering review of the documents submitted for the above <br /> referenced project. Our current review is based on the following submittal items: <br /> • Certificate of Survey prepared by Engineering Design&Surveying, dated 7/8/14 <br /> � Building Plans <br /> We offer the following observations, comments, and recommendations for your consideration: <br /> 1. Erosion and sediment control Best Management Practices (BMPs) should be installed down gradient <br /> from the proposed work. Siltfence should be indicated on the plan in the green areas, and rock check <br /> bags should be indicated at the proposed driveway. <br /> 2. Erosion and sediment control BMPs should be installed and inspected by the City prior to any land <br /> disturbing activities. The Contractor must provide a minimum 24 hour notice prior to inspection. <br /> 3. Additional grading detail (i.e. spot elevations, proposed contours, stairs) should be shown on the plan <br /> to adequately indicate proposed drainage patterns. To ensure runoff is not directed onto adjacent <br /> properties, swales along the side lot lines should be indicated to route runoff toward Navane Lane. <br /> Retaining wall may be necessary in some locations to accommodate the swales. <br /> 4. Driveway slopes are recommended not to exceed 10%maximum slopes. The applicant should <br /> consider revising proposed house/garage elevations to reduce the driveway slope from 12.6% to the <br /> recommended maximum. <br /> 5. A financial security of$2,000 from the Applicant is recommended for erosion control and <br /> engineering oversight. The financial security is intended to provide protection in the event that it <br /> becomes necessary for the City to install or maintain erosion and sediment control within the project <br /> area and covers the cost of vegetation re-establishment if the applicant is unable to follow through <br /> with the conditions of approval. <br /> 6. The applicant will be required to obtain Minnehaha Creek Watershed District(MCWD) approval and <br /> permitting far their Erosion Control Rule. A copy of any approvals or permits required should be <br /> submitted prior to any work. <br /> DESIGNING FOR A BETTER TOMORROW <br /> Bolton&Menk is an equal opportunity employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.