Laserfiche WebLink
1 - ���0 <br /> . ,�\ <br /> O City of Orono FOR CTI'Y USE ONLY <br /> P.O.Box 66 Date Received: Permit# <br /> � � 2750 Kelley Parkway <br /> Crystal Bay,MN 55323 Amount: $ SAC Credit: <br /> (952)249-4600 <br /> "'� ,� Homeowner(s)Signed: ❑Yes <br /> �E' �,� Resolutions(if any)Signed:�Yes ❑None Required <br /> t'9KFSH��� Zonin Disclosure Si ed: ❑Yes ❑None Re uired <br /> CITY OF ORONO - DEMOLITION PERMIT <br /> (Ail permits must be approved by the Buiiding Official and/or Zoning Department) <br /> ,�ob=�Sit��Owner 1nfo.r�a#ion: <br /> Type: �Residential ❑ Commercial <br /> r 2 ��VlC � <br /> Site Address: /��� �'r� (�G��LQ.- <br /> Owner: Mailing Address: <br /> City: �Y 1/��l'�. Zip: <br /> Phone: Email: <br /> ��on�"r��k�r/.Applican'�=1�forma�tior�: - <br /> � , ` , <br /> Contractor/App.: l e .S�( / Contact Person: /�1,(� f��2C � <br /> �J � <br /> Address: JI���I C'I�• ��, S State License#: <br /> City: 1/Vu �G�'O�✓✓1 Zip: 5 S 3� Expiration Date: <br /> Phone: ��4�� D�s2�• ,�j�O,S� Email: Y'Y�` F� C�f G� �Li f 7 Py�'Ie�. !�o� <br /> . _ , , ,. <br /> ,. . �. . ; . �R:E�iL�C���T1��S�:���L���t��E���i' . .,E��I�t� . .. .� <br /> General Instructions: <br /> 1. You may be required to obtain other permits, i.e.: well abandonment, sewer, etc. <br /> 2. Work must not begin unless the permit card is available on the job site. <br /> 3. A 24-48 hour notice is required for all inspections. Call (952) 249-4600. <br /> 4. Sewer must be discontinued at the City service by qualified contractor before demo permit is <br /> issued. <br /> Demolition by means of: ❑ Manual Disassembly �Heavy Equipment ❑ Other <br /> Permit(s) Issued: ❑ Sewer Disconnection ❑ Well Abandonment# <br /> In return for issuance of said Demolition Permit, the undersigned owner hereby agrees to: <br /> 1. Submit a survey, aerial photo or sketch showing all structures on the property. Note which <br /> structures are to be demolished. <br /> 2. Submit a survey, aerial photo or sketch showing proposed erosion control measures in <br /> accordance with Chapter 79, Construction Site Runoff Control. <br /> 3. Submit a copy of permit approval from the Minnehaha Creek Watershed District (MCWD). The <br /> City will not issue a demolition permit without a copy of the permit(s) from the MCWD or <br /> documentation stating permit(s) are not required. <br />