My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010170 - new septic system
Orono
>
Property Files
>
Street Address
>
M
>
Myrtlewood Road
>
70 Myrtlewood Road - 36-118-23-33-0018
>
Septic
>
1998-010170 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:03:24 PM
Creation date
8/2/2017 1:59:28 PM
Metadata
Fields
Template:
x Address Old
House Number
70
Street Name
Myrtlewood
Street Type
Road
Address
70 Myrtlewood Road
Document Type
Septic
PIN
3611823330018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s � a��P TESTING� �NC. Steven B. Schirmers • MPCA Cert.No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> FAX (612}-497-5011 <br /> State License #394 <br /> ;���`��V�� <br /> December 1, 1997 oJAN z 7 19�� <br /> �,�,. <br /> �-� .. <� , <br /> Ray Wells <br /> #70 Myrtlewood Rd. <br /> Orono, Henn. Co., MN <br /> This site has an existing on-site sewage treatment system ctassified as faifed due to not <br /> meeting the 3' separation from the bottom of the system and the saturated soil. The <br /> system is also surface discharging at this time which is classified as an imminent health <br /> hazard and must be repaired or disconnected within 10 months. <br /> This on-site sewage treatment system is designed for a Type 1, three bedroom home, in <br /> accordance with the Minnesota Pollution Control Agency Chapter 7080 and local <br /> ordinances. Approval will be needed for the existing well to be 57' from the system. <br /> Approval will also be needed for the system to be 13' from the north property line and on <br /> a 10% to 12% slope, 6% is required. <br /> The existing tanks will need to be abandoned, pumped and filled with soil if not water <br /> tight. The new tanks will need approval for a 50' setback from the wetland. <br /> The soils on this site are SCS soils mapped - HbC - Hayden loam. The seasonally <br /> saturated soils were located at 18" & 24" (mottled soil). Due to the seasonally saturated <br /> soils, a Pressurized Mound System will need to be installed to treat septic effluent. The <br /> bottom of the treatment area must be located at least 3' above the saturated soils. <br /> The soils at a depth of 12" have a percolation rate averaging 13.0 mpi. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area. <br /> The power supply and switches must be located outside the manhole and pumping <br /> chamber in a weather proof enclosure. A waming device must be installed with a light <br /> and sound device, this is in case of a pump failure. Insulate the supply line through the <br /> driveway. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.