My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-00922 - water pass through fees
Orono
>
Property Files
>
Street Address
>
M
>
Myrtlewood Road
>
50 Myrtlewood Road - 36-118-23-33-0006
>
Permits/Inspections
>
2009-00922 - water pass through fees
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:02:59 PM
Creation date
8/2/2017 12:40:01 PM
Metadata
Fields
Template:
x Address Old
House Number
50
Street Name
Myrtlewood
Street Type
Road
Address
50 Myrtlewood Road
Document Type
Permits/Inspections
PIN
3611823330006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> � �SAC Charge(2009 Rate=$2,000.00) $ a�OD. �0 <br /> (SAC Charge must accompany all sewer permit applicarions unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> (If not prepaid,a sewer connection permit will not be issued) <br /> �Sewer Connection Charge—City of Wayzata(Pass Through Fee) $ ��J. O� <br /> (2009 Rate=$525.00) • <br /> �Water Connection Charge—City of Wayzata(Pass Through Fee) $ �� a� • �� <br /> (2009 Rate-$1,920.00) <br /> ❑ Water Connection Opt-Out—(Please Initial) <br /> I am choosing not to hook-un to water at this time. <br /> ❑ Water Availability— (Please Initial) <br /> I am choosing not to hook-uu to water at this time. I have chosen to <br /> have my contractor make it water available for future hook-up. <br /> Water Availabilitv Eaplanation: <br /> Contractor installed line to inside of house for future hook-up. <br /> This line will be inspected by the Public Works Department. <br /> Required Before Water Connecrion Pemut is Issued: <br /> 1. Issue Water Meter&Horn Permit <br /> 2. Any Additional Connection Fees Paid(If Applicable) <br /> Issue Water Connection Permit: <br /> 1. Collect Permit Fee&Issue Water Connection Permit <br /> D � <br /> TOTAL PERMIT FEE(Add Fees Listed Above) $ ���� <br /> AD�7ITIONAL INFC�kMATIC}N-WA'I'ER METERS <br /> ■ WATER METERS must be picked up and paid for at Orono City Hall,these are on a separate permit. <br /> Typically the contractor will pick-up and pay for this permit. <br /> ■ WATER METER5 must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of ineter installation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to do <br /> all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota,and certifies that all statements made on this application are,true and correct. <br /> Owner: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.