Laserfiche WebLink
. � <br /> � ����. <br /> ❑SAC Charge(2010 Rate=$2,100.00) $ <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> (If not prepaid,a sewer connection permit will not be issued) <br /> �Sewer Connection/Disconnect/Repair($50.00/Per Stub) $___ 5 ��[) <br /> Pipe size�_inches;material�Schd 40 air tested; cast iron <br /> �Water Connection/Disconnect/Repair($50.00/Per Stub) $��, � <br /> Pipe size `�_inches;material�_Schd 40 air tested; copper <br /> ❑Water Availability For Future Hook-Up to Water($50;00) $ <br /> Water Availabilitv Exnlanation: <br /> Contractor installed line to inside of house for future hook-up. <br /> This line will be inspected by the Public Works Deparhnent. <br /> Required Before Water Connection Permit is Issued: <br /> 1. Issue Water Meter&Horn Permit <br /> 2. Any Additional Connection Fees Paid(If Applicable) <br /> Issue Water Connection Permit: <br /> 1. Collect Permit Fee&Issue Water Connection Permit <br /> 1. SUBTOTAL of Permit Requested: $ (��, ��� <br /> 2. STATE SURCHARGE $ .50 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 2.00 <br /> 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ �O[7. �n <br /> ADDITIONAL INFORMATIQN—WATER METERS <br /> ■ WATER METERS must be picked up and paid for at Orono City Hall,these are on a s�arate permit. <br /> ■ WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of ineter instatlation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit,agrees to do <br /> all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota,and certifies that all statements made on this application are,true and correct. <br /> Applicant: �„�L Mn+� Date: �- p�9 - l� <br /> �;a. �,��',�"r ""�� +'���I�'y,V <br />