Laserfiche WebLink
Christine Mattson <br /> From: Jesse Struve <br /> Sent: Wednesday, March 28, 2012 2:42 PM <br /> To: Christine Mattson <br /> Subject: 20120328 -25 Myrtlewood Rd plan review <br /> Christine, <br /> I have reviewed the plans for 25 Myrtlewood Rd with a plansheet dated 12/8/11 received on March 14, 2012 and have <br /> the following comments: <br /> 1. The wetland delineation was performed outside of the normal growing season (May 1-October 15). I will give <br /> preliminary approval of the delineation, but there needs to be review of the delineation during the normal <br /> growing season prior to official approval. <br /> 2. Need official approval ofwetland delineation with Minnehaha Creek Watershed District. <br /> The applicant is aware the final delineation is required and may change based on site review in 2012's growing season. <br /> Since the proposed structure is well outside of the required wetland buffer zone (25')and buffer zone structure setback <br /> (20')the applicants would like approval of the permit. I am comfortable in approving the permit on the condition of: <br /> • If there is a large change in the preliminary 2011 wetland delineation based on a site visit in the 2012 growing <br /> season and the structure encroaches into the buffer zone and buffer setback, the applicant will be required to <br /> move the structure to a location outside of the buffer and buffer zone setback per Orono City Code at no <br /> expense to the City. <br /> Please contact me if you have additional questions or concerns. <br /> Jesse Struve, PE <br /> Director of Public Works/City Engineer <br /> City of Orono <br /> (952) 249-4661 - Direct <br /> (952) 249-4616 - Fax <br /> www.ci.orono.mn.us <br /> 1 <br />