My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: as-built
Orono
>
Property Files
>
Street Address
>
M
>
Myrtlewood Road
>
25 Myrtlewood Road - 36-118-23-33-0014
>
Correspondence
>
Re: as-built
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:03:18 PM
Creation date
8/1/2017 1:21:57 PM
Metadata
Fields
Template:
x Address Old
House Number
25
Street Name
Myrtlewood
Street Type
Road
Address
25 Myrtlewood Road
Document Type
Correspondence
PIN
3611823330014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thank you for contacting me. I have confirmed all inspections have been completed. We will continue to hold the <br /> $2,500 escrow and will apply it to the Zoning Permit(copy attached)that your landscaper must submit with a plan prior <br /> to the commencement of the work. <br /> If you have any questions, please don't hesitate to contact me. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway � Orono � MN � 55356(physical addressJ <br /> PO Box 66 I Crystal Bay � MN � 55323-0066 (mailing address) <br /> '� 952.249.4620 � 8 952.249.4616 <br /> � cmattson@ci.orono.mn.us � �] www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> OUR OFFICE W/LL BE CLOSED: Thursday& Friday, December 24&25,2015 <br /> Friday,January 1,2016 <br /> From: Ryan,Steven [mailto:SRvan@Bri��s.com] <br /> Sent:Tuesday, November 24, 2015 10:36 AM <br /> To:Christine Mattson<CMattson@ci.orono.mn.us> <br /> Subject: RE: 25 Myrtlewood Road/#2014-00759 <br /> Christine, hope this finds you well. <br /> Our landscaping contractor, Maple Crest Landscaping,completed the re-installation of the silt-fencing several weeks <br /> ago. We will not, however, be able to re-vegetate areas disturbed by construction until weather permits in the <br /> spring. As far as we are concerned, all other work relating to the permit noted above has been completed. <br /> Tivoli (Robi Jamesweathers) has asked that, if possible,we close out the existing permit with the City and assume <br /> responsibility for re-vegetation in the spring. This seems appropriate to me,given that the re-vegetation and other <br /> landscaping work will be performed under a separate contract with Maple Crest Landscaping and outside of our general <br /> contract with Tivoli. We understand that the City would continue to hold our deposit until re-vegetation is <br /> completed. All that said, I am not familiar with the City's procedures for closing out these kinds of permits—please let <br /> me know how we should proceed. <br /> Also, I would like to confirm that the deposit is held in our names(Steve and Anne Ryan),since we provided Tivoli with <br /> the funds used to make the deposit. Robi has told me he would sign whatever documentation the City needs to transfer <br /> the deposit, if a transfer is necessary. <br /> Thanks for all your help on this project, and hope you have an enjoyable Thanksgiving. <br /> Steve <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.