My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-0119 - new structure
Orono
>
Property Files
>
Street Address
>
M
>
Myrtlewood Road
>
10 Myrtlewood Road - 36-118-23-33-0009
>
Permits/Inspections
>
2015-0119 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:03:03 PM
Creation date
8/1/2017 12:09:22 PM
Metadata
Fields
Template:
x Address Old
House Number
10
Street Name
Myrtlewood
Street Type
Road
Address
10 Myrtlewood Road
Document Type
Permits/Inspections
PIN
3611823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
scale with a note of stone or concrete material (the decision of materials has not <br /> yet been made). The plan also shows the patio consisting of a cedar pergola with <br /> cedar posts supported by concrete footings on the foundation plan and a natural <br /> gas fueled fire pit. The foundation plan also notes that the patio will be at grade so <br /> there will not be a required railing on the perimeter. The hardscape plan does in <br /> fact match what is shown on the survey. The only item missing from the original <br /> submittal that you requested is the individual performing the work. The plan is to <br /> have multiple subcontractors involved. They are: <br /> • Ostertag Concrete Inc install/pour he foundational aspects of the <br /> plan including the patio surface should concrete be selected, <br /> pergola footings and planter walls on the right side of the front of the <br /> home. <br /> • Stone Mountain Landscaping will install the paver patio should <br /> pavers be selected. <br /> • Hawkins Tree and Landscape will install boulder walls all of which <br /> will be under 4 foot. Hawkins will also perForm final grade including <br /> black soil placement and importation if necessary preceding <br /> installation of the sod. Hawkins Tree and Landscape will also <br /> prepare, edge, fabric and install all selected plantings and trees. <br /> • T. Holme Contracting LLC will build and install the pergola on site. <br /> • Genz-Ryan HVAC will rough-in natural gas line to natural gas fire <br /> pit. Vendor of the actual burning device has yet to be selected. <br /> • Pro Irrigation Inc— Cologne MN —will install irrigation system <br /> • Tonka Gutters will install the homes gutters <br /> • The sod vendor has yet to be determined. <br /> Softscape planting inventories will be developed next spring when they will be <br /> needed. <br /> • Separate City Permits Required. <br /> • Water disconnect—This home is serviced by a well. So I do not <br /> believe a city water disconnection is required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.