My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01546 - sewer/water pass through fees with wayzata
Orono
>
Property Files
>
Street Address
>
M
>
Myrtlewood Road
>
10 Myrtlewood Road - 36-118-23-33-0009
>
Permits/Inspections
>
2015-01546 - sewer/water pass through fees with wayzata
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:03:03 PM
Creation date
8/1/2017 12:02:10 PM
Metadata
Fields
Template:
x Address Old
House Number
10
Street Name
Myrtlewood
Street Type
Road
Address
10 Myrtlewood Road
Document Type
Permits/Inspections
PIN
3611823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> DETERMINING PERMIT FEES <br /> ❑ SAC Charge(2015 Rate=$2,485.00) $ <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> (If not prepaid,a sewer connection permit will not be issued) <br /> � Sewer Connection Charge—City of Wayzata(Pass Through Fee) $ <br /> (2015 Rate=$602.00) <br /> � Water Connection Charge—City of Wayzata(Pass Through Fee) $ <br /> (2015 Rate-$2,165.00) <br /> ❑ Water Connection Opt-Out—(Please Initial) <br /> I am choosing not to hook-ua to water at this time. <br /> ❑ Water Availability— (Please Initial) <br /> I am choosing not to hook-ua to water at this time. I have chosen to <br /> have my contractor make it water available for future hook-up. <br /> Water Availabilitv Exulanation: <br /> Contractor installed line to inside of house for future hook-up. <br /> This line will be inspected by the Public Works Department. <br /> Required Before Water Connection Permit is Issued: <br /> 1. Issue Water Meter&Horn Permit <br /> 2. Any Additional Connection Fees Paid(If Applicable) <br /> Issue Water Connection Permit: <br /> 1. Collect Permit Fee&Issue Water Connection Permit <br /> TOTAL PERMIT FEE(Add Fees Listed Above) $ <br /> ADDITIONAL INFORMATION—WATER METERS <br /> ■ WATER METERS must be picked up and paid for at Orono City Hall,these are on a senarate permit. <br /> Typically the contractor will pick-up and pay for this permit. <br /> ■ WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of ineter installation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to do <br /> all work in strict accordance with the ardinances of the City and the regulations of the State of <br /> Minnesota, and certifies that all statements made on this application are,true and correct. <br /> ,� '� �, <br /> Owner: <br /> �<-�t�� ��i1/'� ���.J Date: %� ��6 �. <br />
The URL can be used to link to this page
Your browser does not support the video tag.