Laserfiche WebLink
1 -� " ��50�� <br /> CITY OF ORONO S�P'TIC SYSTEM PERMTT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, N�t 5�323 <br /> .� �� � <br /> JOB SITE ADDRESS. <br /> Occupancy Type: Residential �_ Commercial Other <br /> % <br /> Permit Type: New or Replacement System, $100.00 � <br /> Repair Existing SYstem, $ 50.00 <br /> (Tanks or Drain�ield) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Nam • PhoneNumber: �7-3 —'��r' <br /> Mailing Add s: City:��/��e— �P� ��`3 <br /> Phone Number• �7.3—�3�v —' <br /> Contractor's Name• _ �-- s> <br /> Mailing Address: �6 City� � ��� <br /> DO NOT MAII. PAYMENT WITH THIS APPI'ICATION <br /> GENERAL INSTRUCTIONS <br /> 1, Applications for septic system permits may be mailed or submitted in person at the City <br /> Off'ices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the Ciry O�ces and work must not begin unless the permit card is on the job <br /> site. <br /> 2, permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4, The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> g, Tanlc installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in � rock b P• S��on <br /> D. F i n a l i n s pection to ve r i f y pro per final cover depths and to veri that all ump <br /> (where required) components are functional and comply wi t h co des. <br /> 5. Individual holding NIPCA Installer Certificate shall be present during inspections: A 24- <br /> hour notice is required for all inspections. <br />