My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-007505 - sewer and water
Orono
>
Property Files
>
Street Address
>
M
>
Myrtlewood Road
>
10 Myrtlewood Road - 36-118-23-33-0009
>
Permits/Inspections
>
1995-007505 - sewer and water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:03:01 PM
Creation date
8/1/2017 12:00:49 PM
Metadata
Fields
Template:
x Address Old
House Number
10
Street Name
Myrtlewood
Street Type
Road
Address
10 Myrtlewood Road
Document Type
Permits/Inspections
PIN
3611823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 -� " ��50�� <br /> CITY OF ORONO S�P'TIC SYSTEM PERMTT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, N�t 5�323 <br /> .� �� � <br /> JOB SITE ADDRESS. <br /> Occupancy Type: Residential �_ Commercial Other <br /> % <br /> Permit Type: New or Replacement System, $100.00 � <br /> Repair Existing SYstem, $ 50.00 <br /> (Tanks or Drain�ield) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Nam • PhoneNumber: �7-3 —'��r' <br /> Mailing Add s: City:��/��e— �P� ��`3 <br /> Phone Number• �7.3—�3�v —' <br /> Contractor's Name• _ �-- s> <br /> Mailing Address: �6 City� � ��� <br /> DO NOT MAII. PAYMENT WITH THIS APPI'ICATION <br /> GENERAL INSTRUCTIONS <br /> 1, Applications for septic system permits may be mailed or submitted in person at the City <br /> Off'ices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the Ciry O�ces and work must not begin unless the permit card is on the job <br /> site. <br /> 2, permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4, The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> g, Tanlc installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in � rock b P• S��on <br /> D. F i n a l i n s pection to ve r i f y pro per final cover depths and to veri that all ump <br /> (where required) components are functional and comply wi t h co des. <br /> 5. Individual holding NIPCA Installer Certificate shall be present during inspections: A 24- <br /> hour notice is required for all inspections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.