My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
sewer and water fees
Orono
>
Property Files
>
Street Address
>
M
>
Myrtlewood Road
>
10 Myrtlewood Road - 36-118-23-33-0009
>
Misc
>
sewer and water fees
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:03:05 PM
Creation date
8/1/2017 11:38:53 AM
Metadata
Fields
Template:
x Address Old
House Number
10
Street Name
Myrtlewood
Street Type
Road
Address
10 Myrtlewood Road
Document Type
Misc
PIN
3611823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Orono <br /> Page 1 <br /> Myrt/ewood Sewer and Water Improvements <br /> Odober 14,Z009 <br /> Summary of Estimated Costs: Following is a summary of additional costs that you will incur at <br /> the time of making connections: <br /> Sewer: Metropolitan Council SAC: $2,000.00 <br /> City of Orono Connection Permit: $ 50.00 `� <br /> City of Wayzata Sewer Connection Charge: $ 525.00 <br /> Grinder pump station, abandonment of septic tank <br /> &connection of property to sewer system Contact sewer contractor <br /> Water: City of Orono Connection Permit: $ 50.00 <br /> Ciry of Orono Water Meter(size to be determined): To be determined <br /> City of Wayzata Water Connection Charge: $1,920.00 <br /> Connection of property to water system Contact plumber for estimate <br /> The City policy states that sewer connections must be completed by the date that a <br /> nonconforming septic system would need to be replaced. The time frame for replacement of <br /> nonconforming septic systems is December 31, 2010 on a city wide basis. Water connections are <br /> optional and there are no deadlines to complete connections to the water system. <br /> Grinder Pump Requirements <br /> The sewer system installed is a pressure system and all properties will need to install, operate <br /> and maintain their own grinder pumps. The grinder pumps installed will be required to meet <br /> certain operating parameters to function adequately with this system. All pumps must be a <br /> progressive cavity type pump as manufactured by E/one or an approved equal. Your plumber witl <br /> need to provide the City information on the proposed type of pump used when obtaining a sewer <br /> connection permit. <br /> Thank you for your assistance in making this a successful project. Please contact me at 651-604- <br /> 4863 if you have any questions. <br /> Sincerely, <br /> � � <br /> Tom Kellogg <br /> City Engineer (Z�'�- �f'-�r 7 5� <br /> (�1C1��v g.��j�6 <br /> .` <br /> . � <br /> , --- <br />
The URL can be used to link to this page
Your browser does not support the video tag.