Laserfiche WebLink
City of Orono <br /> Page 1 <br /> Myrt/ewood Sewer and Water Improvements <br /> Odober 14,Z009 <br /> Summary of Estimated Costs: Following is a summary of additional costs that you will incur at <br /> the time of making connections: <br /> Sewer: Metropolitan Council SAC: $2,000.00 <br /> City of Orono Connection Permit: $ 50.00 `� <br /> City of Wayzata Sewer Connection Charge: $ 525.00 <br /> Grinder pump station, abandonment of septic tank <br /> &connection of property to sewer system Contact sewer contractor <br /> Water: City of Orono Connection Permit: $ 50.00 <br /> Ciry of Orono Water Meter(size to be determined): To be determined <br /> City of Wayzata Water Connection Charge: $1,920.00 <br /> Connection of property to water system Contact plumber for estimate <br /> The City policy states that sewer connections must be completed by the date that a <br /> nonconforming septic system would need to be replaced. The time frame for replacement of <br /> nonconforming septic systems is December 31, 2010 on a city wide basis. Water connections are <br /> optional and there are no deadlines to complete connections to the water system. <br /> Grinder Pump Requirements <br /> The sewer system installed is a pressure system and all properties will need to install, operate <br /> and maintain their own grinder pumps. The grinder pumps installed will be required to meet <br /> certain operating parameters to function adequately with this system. All pumps must be a <br /> progressive cavity type pump as manufactured by E/one or an approved equal. Your plumber witl <br /> need to provide the City information on the proposed type of pump used when obtaining a sewer <br /> connection permit. <br /> Thank you for your assistance in making this a successful project. Please contact me at 651-604- <br /> 4863 if you have any questions. <br /> Sincerely, <br /> � � <br /> Tom Kellogg <br /> City Engineer (Z�'�- �f'-�r 7 5� <br /> (�1C1��v g.��j�6 <br /> .` <br /> . � <br /> , --- <br />