Laserfiche WebLink
Christine Mattson <br /> From: Adam Edwards <br /> Sent: Tuesday,August 16, 2016 4:36 PM <br /> To: Christine Mattson <br /> Subject: RE: 517 Ferndale Road N/#2015-00014 <br /> Chris, <br /> I've reviewed the subject as built and offer the following comments: <br /> 1. The survey lists the septic sites as proposed. The word "proposed" should be removed if they have been <br /> constructed. <br /> 2. The survey depict pillars(L)within 3 feet of the edge of road. I didn't not see an approved monument permit in <br /> the packet . I believe you are already addressing this. <br /> • 3. Once item#1 is resolved an inspector should conduct a site visit and confirm the following: <br /> a. The survey accurately depicts conditions on the ground. <br /> b. The site is stabilized to the point the any remaining erosion control can be removed. <br /> Adam <br /> From:Christine Mattson <br /> Sent: Monday,August 15, 201610:00 AM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us> <br /> Subject: 517 Ferndale Road N/#2015-00014 <br /> Adam, <br /> We received an as-built survey for 517 Ferndale Road N. Please review and provide comments. Thank you. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway I Orono I MN I 55356(physical addressJ <br /> PO Box 66 I Crystal Bay I MN I 55323-0066 (mailing addressJ <br /> '� 952.249.4620 g 8 952.249.4616 <br /> � cmattson@ci.orono.mn.us 0 � www.ci.orono.mn.us <br /> Summer Office Hours: (Monday, May 23 throuqh Friday,Sepiember 2,2016) <br /> Monday-Thursday: 7:30 am to 5 pm <br /> Friday: 7:30 am to 11:30 am <br /> OUR OFFICE WILL BE CLOSED: Monday,September 5,2016 <br /> i <br />