Laserfiche WebLink
� ' . . <br /> f . . ,� <br /> � O� <br /> O O CITY of ORONO <br /> �,�, Municipal Offices <br /> ,.� �, Street Address: Mailing Address: <br /> '�+�� ,�,�' 2750 Kelley Parkway P.O.Box 66 <br /> ,�G Orono,MN 55356 Crystal Bay,MN 55323-0066 <br /> ��kESHOg' <br /> March 12,2012 <br /> Perry Schmidt <br /> 370 Bergamot Drive <br /> Medina, MN 55340 <br /> Re: 517 Ferndale Road North <br /> Building Permit Application#2012-00171 <br /> On March 5, the City received your zoning permit application. After our discussions with your surveyor we now <br /> understand over 501 cubic yards of fill was deposited at the property. Additionally we understand that you wish <br /> to bring in additional fill for the creation of a building pad. This amount of fill requires a Conditional Use Permit <br /> (CUP) application to be approved by the City Council. A CUP has a fee of$700. Because a portion of the work <br /> was conducted prior to approval a double fee($1400)shall apply. <br /> As the initial 501+cubic yards of�II was brought in prior to City approval your property is considered in violation <br /> and after the fact fees apply. The following items must be submitted or revised with your CUP Application to <br /> remove the "violation"status from your property: <br /> 1. Certificate of Survey. The survey submitted (dated February 7, 2012) must be revised to reflect the <br /> following in addition to the standard City survey requirements: <br /> • A legend identifying the labels shown; <br /> • An explanation of"1/2 alt mound"; <br /> • A calculation the total amount of�II currently brought to the site; <br /> • Illustrate the limits of completed grading; <br /> • Pre-fill topography/contours; <br /> • A calculation of additional fill to be brought to the site; and <br /> • Show intended post-fill contours/grading ptan. <br /> 2. Wetland Delineation. The wetland delineation must be approved by the Minnehaha Creek Watershed <br /> District (MCWD). Please provide a wetland delineation report and the MCWD approval of the <br /> delineation.. The delineated edge of the Preserve wetland must be shown on the survey, along with the <br /> required 50' buffer and 20' structure setback from the buffer. <br /> 3. Erosion Control. Submit an erosion control plan or a copy ofthe MCWD Erosion Control Permit. <br /> 4. Escrow & Escrow Agreement. Conditional Use Permits require submittal of an escrow and an escrow <br /> agreement. The purpose of the escrow is to guarantee reimbursement to the City for out-of-pocket <br /> costs incurred during the review of your conditional use permit. Due to the after the fact status of the <br /> property, the required escrow amount for conditional use permits is $2000. The escrow agreement is <br /> enclosed. The property owner must sign the escrow agreement and submit a check for$2000. <br /> Telephone(952)249-4600•Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />