My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road North
>
517 Ferndale Road North - 36-118-23-14-0007
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:01:57 PM
Creation date
7/31/2017 12:56:24 PM
Metadata
Fields
Template:
x Address Old
House Number
517
Street Name
Ferndale
Street Type
Road
Street Direction
North
Address
517 Ferndale Road North
Document Type
Septic
PIN
3611823140007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�STP Design Summary Worksheet `�i� riz�►z,- <br /> :'inn,�;r,�.� r,illt�tior, (�; `1 f i�,�.A��(?l:': <br /> CG�tlrO!.;ttC'�C'✓ .. <br /> At-Grade Design Summary <br /> Absorption Bed Width�ft Absorption Bed Length�ft System Height�ft <br /> Absorption Bed Area�ft� Upstope Berm Width�ft Downs[ope Bertn Width�ft <br /> Endslope Berm�'Jidth�ft System Length�ft System Width�ft <br /> Level Pressure Distribution Summary <br /> No. of Perforated Laterals� Perforation Spaci�g�ft Perforation Diameter 1!4 in <br /> l.ateral Diameter �•� in Suppiy Pipe Diameter 2.00 in Minimum Dose Volume�gal <br /> Ftow Rate 25.0 GPM Tatal Head 26 ft Maximum Dose Votume 43J5 gat <br /> 5_ Additional Info for Type IY/Pretreatment Design <br /> A_ Calculate the orqanic(oadinq usinq optiat i or 2 <br /> 1, Organic Loadirtg =Pounds af SOD X Units <br /> �lbs/day X � _ �t5s BOD/day <br /> 2. Orgonic Loadrng to Pretreotment Unit =Design Ffaw X Estimated BOD in mg/l in the effluent X 8.35=1,000,000 <br /> �gpd X �mg/L X 8.35=1,00O,�OQ= �tbs BOD/day <br /> B. Type of Pretreatmen2 Unit Being instatled: <br /> C. CalculaYe Soil Treatment System Orqanic LoQdinq: lbs. BODlday=Bottom Area =lb5/daylftZ <br /> �tbslday= �ft�_ �ibslday/ft� <br /> CommentslSpeciai Design Considerations: <br /> Mound is sized Yor a 5 bedroom(750gpd)one bedroom bigger than actuat bedrooms in home. Maurzd must be spiit into half pn account <br /> of short contour. Each half to be 10 x 32'to have the same amount of lateral length. Downslope sand bed is 16 feet. There are 15 <br /> inches of difference in elevation between the two rockbeds. Uneven elevation accounted for with duat pump,tirrae dose arrangement in <br /> the pump station. Foltowing hAound des9gn is per individual hatf urtit,(375gpd each)denoting exact dimensions,hole sizing,spacing and <br /> number. Each unit is identical in alt respects e�ccept for stope and rnerall footprint size. Stope is 8%for one unit and 13h far the other. <br /> i hereby certify that I have completed this work in accordante with all appticabte ordinances, rules and laws. <br /> Dale Denn 583 09/22/14 <br /> (Designer) (Signature) (License#) (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.