Laserfiche WebLink
9. i'his permit is permissive only. No liability shall be imposed by the State of Minnesota or any of its offrcers, agents or <br /> employees, o�cially or personally, on account of Ihe granting hereoF or on account of any damage to any person or <br /> property resulting from any act or omission of the permittee or any of its agents, employees, or contractors. This permit <br /> shall not be construed as eskopping or limiting any legal claims or right of actian of any person other than the state <br /> against the permittee, its agents, employees, or contractors, for any damage or injury resulting from any such act or <br /> omission, or as estopping or limiting any legal claim or right of action of the state against the permittee, its agents, <br /> employees,or contractors for violation of or failure to comply with the permit or applicable conditions. <br /> 10. Any extension of the surface of public waters from work authorized by this permit shall become public waters and left <br /> open and unobstnlcted for use by the publlc. <br /> 11. Where the work authorized by this permit involves the draining or filling of wetlands not subject to DNR regulations, khe <br /> permittee shall not initiate any work under this permit until the pe�mittee has obtained official approval from the <br /> responsible local government unit as cequfred by the Minnesota Wetland Conservation Act. <br /> 12. Erosion control measures shall be adequately designed for the site characteristics. They may include staked hay bales, <br /> diversion channels, sediment ponds, or sediment fences. They shall be installed in accordance with"State of Minnesota <br /> Stormwater Man��l"MPCA, November 2005(and as revised in the future),prior to commencement and maintained <br /> throughout the project. All exposed soil shall be stabilized as soon as possible and no later than 72 hours after the <br /> completion of the project. Topsoil should be used to re-dress disturbed soil areas and indigenous plant species should <br /> be used to revegetate disturbed areas whenever possible. <br /> 13. No activity affecting the bed of the protected water may be concfucted between April 1 and June 30, to minimize <br /> impacts on fish spawning and migration. If work during this time is essential, it shall be done only upon written approval <br /> of the Area Fisheries Manager, at 952-826-6756. <br /> c: Minnetonka Portable Dredging, Tom Niccum,with permit card U.S.Arrrty Corps of Engineers,Melissa Jenny <br /> City of Orono, Mike Gaffron DNR Conservation Officer,Jackie Glaser <br /> Hennepin County,Jcel Settles DNR Ecological Services, Melissa Doperalski <br /> Hennepin Conservation District, Stacey I.ijewski DNR Fisheries, Daryl Ellison <br /> Minnehaha Creek Watershed District, Steve Christopher DNR Regional Hydrologist,Dale Homuth <br /> Christmas Lake(27-137P)File DNR Waters Pernuts Unit <br /> DNR Wildlife, Bryan Lueth <br /> ! Aut ized ignatura Title Date <br /> ; � nr �����-o <br /> Jo . Gleason Area Hydrolo ist <br /> Ver i 12/1�'2001 This information is availab'.e in an alterna:ive f'orniat upon request <br />