Laserfiche WebLink
Minor Land Alteration: Description of Work <br /> Nathan VanCamp <br /> 601 Minnetonka Highlands Lane <br /> Orono, MN 55356 <br /> The line colors noted in the description below are referring to the map that is included <br /> with this application which is titled"Description of Work." <br /> 1. Existing Land Contour <br /> The south western corner of the property is the highest elevation. From that point the <br /> property slopes down to the northern, northeastern and eastern corners. The total <br /> change in slope from the south west corner to all other corners is roughly 10 feet. <br /> The proposed fill area(Black line) is fairly level, however it has a slight slope as <br /> indicated(Green lines). The proposed fill area is the lowest grade on the property. <br /> The proposed fill area has a steep bank along all sides. This bank follows the <br /> outlined fill area line. Along Minnetonka Highlands Lane (southern side)the bank is <br /> approximately 4 feet high and tapers down along Tonkawa Road (eastern side) and is <br /> about 18 inches at the north eastern corner. Along Elm Street(northern side) the <br /> proposed fill area this bank is approximately 18 inches high. There is an 18 inches <br /> bank along the north western edge of the proposed fill area, and slopes up to <br /> approximately 3.5 feet at the south western corner of the fill area. <br /> 2. Proposed Land Contours <br /> The proposed fill area is approximately 40 feet wide and 100 feet long. Around 250- <br /> 300 cubic yards of fill will be brought in(see included Fill Hauling Route)to raise the <br /> elevation approximately 18-24 inches. This will eliminate the bank along the western <br /> portion of the fill area and make the back yard level with the fill area. Fill material <br /> will be comprised of 14-18 inches of a clay/sand mixture and will be topped with 4 <br /> inches of black dirt. The fill area will be graded to maintain the current slope (Green <br /> lines). A swale will be made along the western and northern most edges of the fill <br /> area to capture and direct water run off from both the streets and the property <br /> (()rxn�;e lines). This will flow into the culvert(Brown lines) along the northern edge <br /> of the property. This culvert directs the water into the ditch along Elm Street. <br /> 3. Erosion Control Plan <br /> During the filling and grading activities a silt fence (Red lines)will be installed <br /> between the fill area and the culvert along Elm Street. This will capture any soil that <br /> erodes during rain storms. Grass will be planted on the entire fill area. Once the <br /> seed has completely rooted in the silt fence (Red lines)will be removed. <br />